Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
OFFSHORE
MODULES
Gruppo Antonini S.p.A. Registered Office: Via Enrico Fermi 7 - 54026 Groppoli (MS) Italy - VAT NUMBER IT00364890459
Design @ All Right Reserved 2020 - Sito web made by Marketing Department
2022/IN PROGRESS
EPCI OF 2 PREDRILLING TEMPLATES AND DOCKING PILES – MELLITAH OIL & GAS - OFFSHORE LIBYA
Detailed, construction and installation engineering, supply of materials, fabrication, integration of latching system for docking piles, TRANSPORTATION of two pre-drilling templates and docking piles, INSTALLATION of PDTs and assistance to Drilling Contractor for docking piles installation, for future platforms WHPA and PPE.
2022/IN PROGRESS
EPCI for MRU MODULE and VESSELS – CHEVRON – TAMAR PTF ISRAEL
Construction engineering, material supply, fabrication, erection, mechanical completion and pre-commissioning, load-out & sea fastening, transportation to site transportation, offshore installation with a SINGLE LIFT of a module composed by:
3 level decks, 12 x 12 mt, 250 tons, fully equipped of mechanical item, piping lines, valves, E/I equipment, cables and cable trays. The main items have been supplied by Client
GA has performed the EPC of n. 4 vessels to be installed on the module as well. The vessels are in Inox and Super Duplex.
2018
BALTIM SW PLATFORM – PETROBEL/ENI – EGYPT
Engineering development for workshop, JACKET and DECK STRUCTURAL materials supplied in prefabricated items through containers (leg cans, joints, tubulars, plates, beams, gratings, etc.). RISER supply and application on field joints executed at construction site (in Egypt).
Total weight: 2450 tons
2017/2018
OIL TREATMENT SYSTEM SKIDs – SABRATHA PLATFORM – NOV/FJORDS MOG
PRESSURE VESSELS and OIL TREATMENT SKIDs CONSTRUCTION relevant to the existing SABRATHA platform, for the improvement of relevant treatment plant.
The Contract includes: structural and piping skid fabrication, completion and pre-commissioning, 1 pressure vessel in C.S. with overlay in INCONEL 625, 1 pressure vessel in INCONEL 625, 2 pressure vessels in C.S. as loose items.
2017
2017
EPC WHP3 OIL PTF SUPPLY of E/I HOUSE – ENI Congo
EPC WHP3 OIL PTF SUPPLY of EQUIPMENTS, SKIDS – ENI Congo
Engineering, supply, onshore fabrication and transportation to site of n.1 fully equipped E/I SHELTER, of 25 tons, composed by architectural & structural fabrication, A60 insulation classification, internal lining, completed by: PMCC, ICSS switchboards, UPS and batteries, E/I systems, HVAC system, detection and fixed fire-fighting system, etc.
SUPPLY and transportation to site of: n.1 launching trap, n.3 chemical skids including chemical storage tanks, WHCP, Platform crane, SDV unit 0190, platform vessels & tanks.
2016/2018
EPC WHP4 OIL PTF REFURBISHMENT & TOPSIDE INTEGRATION – ENI Congo
The contract includes three work steps:
1°) REFURBISHMENT and improvement of structure of existing JACKET and DECK in Louisiana (USA) and transportation from there to CONGO;
2°) PREFABRICATION in Italy at GA workshop/shipyard of n.4+2 foundation piles, boat landing, mechanical & piping equipments and system, skids & packages;
3°) final TOPSIDE INTEGRATION of complete PLATFORM in Congo and offshore hook-up works and final commissioning;
TOPSIDE INTEGRATION includes the complete PLATFORM completion (structure of Jacket and Deck improvement (boat landing, additional structures reinforcements, etc.), Flare completion, installation of mechanical & piping plant, skids, packages, E/I plant, painting and insulation) including onshore test and pre-commissioning in Congo, load-out & sea fastening, transportation to offshore installation site, hook-up and commissioning up to start-up assistance.
The contract includes the separate fabrication of two levels E/I SHELTER, composed by architectural & structural fabrication, PMCC/ICSS/UPS switchboards, Batteries, E/I systems, HVAC system, etc. Deck: 1100 tons, Jacket: 500 tons, Piles: 650 tons
E/I SHELTER: 80 tons.
2015
EPC BONACCIA NW GAS PTF – DECK CONSTRUCTION & ptf comm – ENI Italia
CONSTRUCTION of complete PLATFORM DECK (structure for Deck, Flare, mechanical & piping plant, skids, packages, E/I plants, painting and insulation) including E/I shelter, onshore test and pre-commissioning, load-out & sea fastening, transportation to site, hook-up/commissioning, up to 2 wells start-up assistance.
Deck weight: 900 tons.
2003
EPC SABRATHA FLARE CONSTRUCTION – ENI Libya
Construction of FLARE for SABRATHA PLATFORM, completed by structure (140meter length), FLARE K.O. Drum and blowdown line with fireproofing H90 and silicon painting on the top. BD line 30”. The construction activity included the grillage and sea fastening procurement and fabrication and load-out on the transportation barge.
FLARE weight: 750 ton
Create Website with flazio.com | Free and Easy Website Builder