LOAD OUT OF PRE-DRILLING TEMPLATE FOR PPE PLATFORM
On September 17, 2024, the Load Out activity for the Pre-Drilling Templates for the "PPE" and "WHPA" platforms was initiated. The activity is organized in three phases: Load out of the pre-drilling template for the PPE platform, load out of the pre-drilling template for the WHPA platform, and sea fastening and sail away of the structures.
Destination: Libya
Client: MOG Mellitah Oil & Gas
A pre-drilling template for a platform, particularly in the context of offshore oil and gas exploration, is essentially a structure that is installed on the seabed to facilitate the drilling of oil or gas wells, acting as a guide. The structure is made of carbon steel and is designed to ensure drilling operations are carried out with maximum safety.
To identify the location for installing the pre-drilling templates, it is necessary to precisely know where the wells need to be drilled.




LOAD OUT OF PRE DRILLING TEMPLATE FOR WHPA PLATFORM ON BOARD OF CLAUDIO 1 BARGE
09-23-24

SAIL AWAY OF PREDRILLING TEMPLATE FOR PPE AND WHPA PLATFORMS
01-01-24








