EPC LITCHENDJILI OIL/GAS PTF – DECK CONSTRUCTION & ptf comm – ENI Congo 

EPC LITCHENDJILI OIL/GAS PTF – DECK CONSTRUCTION & ptf comm – ENI Congo 

EPC LITCHENDJILI OIL/GAS PTF – DECK CONSTRUCTION & ptf comm – ENI Congo 

amauri-mejia-gvf7rka-e9q-unsplash.jpeg
footer_tavola disegno 1.jpeg
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
amauri-mejia-gvf7rka-e9q-unsplash.jpeg
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
logoblu

CONTACTS

SOCIAL MEDIA

ENERGY

Email: info@gruppoantonini.it
Telephone: +39 0187560746

ANTONINI NAVI

Email: info@antonininavi.com
Telephone: +39 3355948129

Website: www.antonininavi.com

MARINA

Email: nautica@gruppoantonini.it
Telephone: +39 337225431


linkedin
facebook
instagram
bianco

OIL & GAS PLATFORMS

icon

Gruppo Antonini S.p.A. Registered Office: Via Enrico Fermi 7 - 54026 Groppoli (MS) Italy - VAT NUMBER IT00364890459

Model 231 & Whistleblowing

Privacy Policy

Design @ All Right Reserved 2020 - Sito web made by Marketing Department

Cookie Policy

2022/2024

EPC MABOQUEIRO GAS PTF – ENI Angola

Maboqueiro

Engineering, Procurement, and Construction of the complete platform (Jacket structure, Deck, Flare, 4 foundation piles), supply of mechanical components and piping systems, chemical and process skids, generation package, crane, installation of electrical/instrumentation systems, painting and insulation, including instrumentation cabin and E/I technical room, land testing and pre-commissioning, loading and sea fastening, hook-up and commissioning up to startup assistance.

 

  • Deck: 1400 tons
  • Jacket: 2400 tons
  • Piles: 1600 tons

2019/2021

EPC WHP2 OIL PTF CONSTRUCTION – ENI Congo

Whp2

Construction of a complete oil platform, including the Jacket structure, Deck, Flare, and 6 foundation piles (DN 762 piles). Supply of piping systems, chemical and process skids, packages, installation of E/I systems, full painting and insulation, including the supply of a new E/I cabin, supply of diesel generator sets, platform crane, safety equipment, land testing and pre-commissioning, loading and securing, and transport to the site.

 

  • Deck: 1450 tons
  • Jacket: 580 tons
  • Piles: 610 tons

 

 

 

 

2016/2018

EPC WHP4 OIL PTF REFURBISHMENT & TOPSIDE INTEGRATION – ENI Congo 

oil & gas platform

 

The contract includes three phases of work:

REFURBISHMENT AND IMPROVEMENT of the existing JACKET and DECK structure in Louisiana (USA) and their transportation from the origin to Congo;

PREFABRICATION in Italy at the GA shipyard of 4+2 foundation piles, landing platform, mechanical and piping equipment, skids, and packages;

FINAL INTEGRATION of the complete TOPSIDE platform in Congo and offshore hook-up and final commissioning work.

The integration of the TOPSIDE includes the completion of the PLATFORM (improvement of the Jacket and Deck structure, landing platform, additional structural reinforcements, etc.), completion of the flare, installation of mechanical and piping systems, skids, packages, E/I systems, painting and insulation, including land testing and pre-commissioning in Congo, loading and sea fastening, transport to the offshore installation site, hook-up, and commissioning up to startup assistance.

The contract also includes the separate fabrication of two E/I SHELTERS with two levels, comprising architectural and structural fabrication, PMCC/ICSS/UPS electrical panels, batteries, E/I systems, HVAC system, etc.

 

  • Deck: 1100 tons
  • Jacket: 500 tons
  • Piles: 650 tons
  • E/I SHELTERS: 80 tons

 

 

 

oil & gas platform

2015  

EPC CLARA NW GAS PTF – CONSTRUCTION OF THE DECK & PTF COMMISSIONING – ENI Italy.

CONSTRUCTION of the complete deck (structure for deck, flare, mechanical and piping systems, skids, packages, E/I systems, painting and insulation) including E/I shelters, land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up/commissioning up to startup assistance.

 

Weight of the deck: 900 tons.

2014/2015  

Litchendjili

EPC LITCHENDJILI OIL/GAS PTF – DECK CONSTRUCTION & ptf comm – ENI Congo 

Construction of the complete Deck (Deck structure, Flare, mechanical and piping systems, skids, packages, E/I systems, painting and insulation), including E/I technical rooms, HVAC/compressed air rooms, control room, living quarters, helipad, compression module, land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up, and commissioning up to the startup of 8 oil and gas wells.

 

  • Deck: 2400 tons total (Process Deck 1900 tons, Accommodation Module 200 tons, Compression Module 300 tons).

2011/2012  

EPC GUENDALINA PTF CONSTRUCTION – ENI Italia

Oil & gas platform

Construction of a complete platform (Monopod structure, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I system, painting and insulation), including land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up, and commissioning up to startup assistance.

 

  • Deck: 500 tons
  • Jacket: 350 tons
  • Piles: 300 tons

2007/2008  

Vesna

EPC ANA, VESNA, IRINA PTF CONSTRUCTION – INAgip doo

 

 

Complete construction of the ANA, VESNA, and IRINA platforms (Monopod structure, Decks, Flares, foundation piles, mechanical and piping systems, skids, E/I systems, painting and insulation), including land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up, and commissioning up to startup assistance.

Weights for the ANA platform:

  • Deck: 500 tons
  • Monopod: 450 tons
  • Pile: 350 tons

Weights for the VESNA platform:

  • Deck: 500 tons
  • Monopod: 450 tons
  • Pile: 350 tons

Weights for the IRINA platform:

  • Deck: 500 tons
  • Monopod: 450 tons
  • Pile: 350 tons

The platforms were constructed at different shipyards: the Monopod for ANA at the GA shipyard in Lerici (Italy) and the decks for ANA, VESNA, IRINA, and the Monopods for VESNA and IRINA at the GA shipyard in Bakar (Croatia). The EPC works included the supply of materials and revamping of the mechanical and E/I systems for the existing platforms in the IKA/IDA fields.

2004/2006  

EPC IVANA K & IVANA C PTF CONSTRUCTION – INAgip doo

Ivana

 IVANA K

Construction of the complete IVANA K platform (Jacket structure, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I system, painting and insulation), including E/I technical rooms, HVAC/compressed air rooms, control room, land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up, and commissioning.

The weights of the various structures are as follows:

  • Deck: 1800 tons
  • Jacket: 750 tons
  • Pile: 450 tons

The contract also included the revamping of the existing mechanical and E/I systems for the IVANA A platform (connected to Ivana K via a 60-meter bridge).

 IVANA C

 

Construction of the complete IVANA C platform (Monopod structure, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I system, painting and insulation), including land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up, and commissioning.

The weights of the various structures are as follows:

  • Deck: 230 tons
  • Jacket: 320 tons
  • Piles: 280 tons

The contract also included the revamping of the existing mechanical and E/I systems for the IVANA B platform.

2001/2002  

Emilio

EPC EMILIO PTF CONSTRUCTION – ENI Italia

 

Construction of a complete platform (Jacket structure, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I system, painting and insulation), including E/I technical rooms, control room, accommodation module (for 4 people), land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up, and commissioning up to startup assistance.

 

The weights of the various structures are as follows:

  • Deck: 800 tons
  • Jacket: 700 tons
  • Piles: 600 tons
     

The contract also included the revamping of the existing mechanical and E/I systems onshore at the receiving station.

1999/2000 

EPC BARBARA T2 PTF CONSTRUCTION – ENI Italia

Oil & Gas Platform

Construction of a complete PLATFORM (Jacket structure, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I system, painting and insulation), including E/I technical rooms, control room, land testing and pre-commissioning, loading and sea fastening, transport to the site, hook-up, and commissioning up to startup assistance.

 

The weights of the various structures are as follows:

 

  • Deck: 1000 tons
  • Jacket: 800 tons
  • Piles: 500 tons