
C13 – ENI SPA – OIL STORAGE TANKS FOR ENIREWIND GELA
Engineering, supply, fabrication and installation of three oil storage tanks at the ENIREWIND site in Gela, Italy.
Location
Gela
Year / Duration
2025
Installation Site: Gela – ENIREWIND, Italy. Equipment Type: Oil Storage Tanks. Scope of Work: Project Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation, As-Built Documentation. 1. AS-4 OIL STORAGE TANK Material: EN 10025 S275 JR. Internal Diameter (Øint): 2,200 mm. Length: 3,800 mm. Weight: 2,510 kg. Project Pressure: 0.1 barg. Project Temperature: -5 / +40 °C. Applicable Code: API 650. 2. B-S-6 OIL STORAGE TANK Material: EN 10025 S275 JR. Internal Diameter (Øint): 1,500 mm. Length: 3,800 mm. Weight: 1,891 kg. Project Pressure: 0.1 barg. Project Temperature: -5 / +40 °C. Applicable Code: API 650. 3. D-S-34 OIL STORAGE TANK Material: EN 10025 S275 JR. Internal Diameter (Øint): 2,200 mm. Length: 3,950 mm. Weight: 2,765 kg. Project Pressure: 0.1 barg. Project Temperature: -5 / +40 °C. Applicable Code: API 650.
Other Related Projects

C91 – ENI CONGO – PIG LAUNCHING TRAP FOR LITCHENDJILI TO DJENO PIPELINE
Supply of a 16”/12” Pig Launching Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.
View detail
C91 – ENI CONGO – PIG RECEIVING TRAP FOR LITCHENDJILI TO DJENO PIPELINE
Supply of a 16”/12” Pig Receiving Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.
View detail
C109 – EDINA – DRAIN RECOVERY VESSEL FOR IRENA 3 OFFSHORE PLATFORM
Supply of a Double Chamber Drain Recovery Vessel for the IRENA 3 offshore platform, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. Designed for a project pressure of 3.5 bar and a temperature range of -10 °C to +60 °C, in accordance with ASME Section VIII, Division 1 and PED.
View detail