Logo
GruppoAntonini
StoryDivisionsCommitmentProjects
StoryDivisionsCommitmentProjects
C13 – ENI SPA – OIL STORAGE TANKS FOR ENIREWIND GELA
Back to projects
Process equipment › Vessels

C13 – ENI SPA – OIL STORAGE TANKS FOR ENIREWIND GELA

Engineering, supply, fabrication and installation of three oil storage tanks at the ENIREWIND site in Gela, Italy.

Location

Gela

Year / Duration

2025

All projects
Project Description

Installation Site: Gela – ENIREWIND, Italy. Equipment Type: Oil Storage Tanks. Scope of Work: Project Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation, As-Built Documentation. 1. AS-4 OIL STORAGE TANK Material: EN 10025 S275 JR. Internal Diameter (Øint): 2,200 mm. Length: 3,800 mm. Weight: 2,510 kg. Project Pressure: 0.1 barg. Project Temperature: -5 / +40 °C. Applicable Code: API 650. 2. B-S-6 OIL STORAGE TANK Material: EN 10025 S275 JR. Internal Diameter (Øint): 1,500 mm. Length: 3,800 mm. Weight: 1,891 kg. Project Pressure: 0.1 barg. Project Temperature: -5 / +40 °C. Applicable Code: API 650. 3. D-S-34 OIL STORAGE TANK Material: EN 10025 S275 JR. Internal Diameter (Øint): 2,200 mm. Length: 3,950 mm. Weight: 2,765 kg. Project Pressure: 0.1 barg. Project Temperature: -5 / +40 °C. Applicable Code: API 650.

Related

Other Related Projects

03
C91 – ENI CONGO – PIG LAUNCHING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

C91 – ENI CONGO – PIG LAUNCHING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

Supply of a 16”/12” Pig Launching Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.

View detail
C91 – ENI CONGO – PIG RECEIVING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

C91 – ENI CONGO – PIG RECEIVING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

Supply of a 16”/12” Pig Receiving Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.

View detail
C109 – EDINA – DRAIN RECOVERY VESSEL FOR IRENA 3 OFFSHORE PLATFORM

C109 – EDINA – DRAIN RECOVERY VESSEL FOR IRENA 3 OFFSHORE PLATFORM

Supply of a Double Chamber Drain Recovery Vessel for the IRENA 3 offshore platform, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. Designed for a project pressure of 3.5 bar and a temperature range of -10 °C to +60 °C, in accordance with ASME Section VIII, Division 1 and PED.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231