01OPEN CONTRACT – ENI CONGO SA – PRODUCTION & GENERAL MAINTENANCE SERVICES (O&M)
Multi-year contract for production and general maintenance services at ENI Congo facilities.

ENI Congo

Titan/Micoperi
147 projects
01Multi-year contract for production and general maintenance services at ENI Congo facilities.
02The scope of work consists of the revamping of the Fano station
03Supply of three Oil Storage Tanks for the ENIREWIND site in Gela, as part of a project involving the recovery and reuse of equipment from CPI. The scope of work included project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. All three tanks are manufactured from EN 10025 S275 JR carbon steel, with a project pressure of 0.1 barg and a project temperature range of -5 °C to +40 °C, in accordance with API 650.
04Supply of a 16”/12” Pig Launching Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.
05Supply of a 16”/12” Pig Receiving Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.
06Supply of a Double Chamber Drain Recovery Vessel for the IRENA 3 offshore platform, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. Designed for a project pressure of 3.5 bar and a temperature range of -10 °C to +60 °C, in accordance with ASME Section VIII, Division 1 and PED.
07Supply of a Water Degasser Vessel for the IRENA 3 offshore platform, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. Designed for a project pressure of 39 bar and a project temperature range of -29 °C to +60 °C, in accordance with ASME Section VIII, Division 1 and PED requirements.
08Supply of a 10”/8” Pig Launching Trap for the IRENA 3 offshore platform, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. Designed for a project pressure of 39 bar and a project temperature range of -29 °C to +60 °C.
09SOW: EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
10SOW: EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
11SOW: EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
12EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
13SOW: EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
14SOW: EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
15SOW: EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
16EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
17EPC contract for the complete construction of platforms (monopod, deck, flare, piles, mechanical systems, piping, E/I, painting), including onshore testing, transport to site, hook-up, and commissioning up to start-up. The contract also includes the revamping of the existing Izabela platform.
18Multidisciplinary services covering well connections, mechanical erection, steel structures, piping, electrical, instrumentation and automation works at ENI Congo sites.
19Mechanical, electrical, instrumentation and civil works at ENI onshore sites within the North-Centre District of Italy.
20Maintenance services and improvement and modification works on tanks at ENI plants in Sicily.
21Supply of equipment for ENI Versalis Ferrara Refinery, manufactured in SA 240 material and designed in accordance with ASME VIII Div. 1. The project scope includes project management, engineering, material supply, fabrication, certification and installation.
22Supply of two Separator Buffer vessels, identified as V 504 and V 503, for ENI Livorno Refinery. Both vessels are manufactured in SA 516 Gr. 70 steel and designed in accordance with ASME VIII Div. 1. The project scope included project management, engineering, material supply, fabrication, certification and installation.
23Supply of a Steam Generator for ENI Taranto Refinery, manufactured in SA 516 Gr. 60 steel and featuring an internal refractory lining. The project scope included project management, engineering, material supply, fabrication, certification and installation of the equipment.
24Supply of a Reaction Furnace for ENI's Taranto Refinery, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is manufactured from SA 516 Gr. 60 carbon steel, featuring an internal refractory lining and an external aluminium shield. Designed for a project pressure of 5 bar and a project temperature range of -5 °C to +343 °C, with an internal process temperature of approximately 1,500 °C, in accordance with VSR requirements and the PED.
25Supply of a DEA Regenerating Column for ENI's Sannazzaro Refinery, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is manufactured from SA 516 Gr. 60 carbon steel with an internal lining in SA 240 316L stainless steel, including internal process plates. Designed for a project pressure of 3.43 bar and a project temperature range of -15 °C to +150 °C, in accordance with EN 13445 and PED requirements.
26SOW: EPC contract for demolition of items
27SOW: EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
28EPCIC contract for engineering, procurement, construction, transportation, and installation of a complete platform: 4-leg Jacket (6,500 tons), 8 piles (4,500 tons), Topside (7,500 tons), Living Quarters (900 tons), and FMWR (3,000 tons). Installation in the Mediterranean Sea, 120 km offshore.
29Project Engineering, Procurement and Construction of the WHPA platform Living Quarters, supply of mechanical components and piping systems, process skids and packages, installation of electrical and instrumentation systems.
30Supply of two BEU heat exchangers serving as Compressor Aftercoolers for the Sabratha Platform Compression Module. The equipment is manufactured in SA 516 Gr. 70 steel with Incoloy 625 cladding and fitted with U-tube bundles in Incoloy 625. The project scope included project management, engineering, material supply, fabrication, certification and installation.
31Supply of a Compressor Suction KO Drum for the Sabratha Platform Compression Module, manufactured in SA 516 Gr. 70 steel with Incoloy 625 cladding and Incoloy 625 internal process components. Designed for a pressure of 67.7 bar, the vessel was manufactured in accordance with ASME VIII Div. 1. The project scope included project management, engineering, material supply, fabrication, certification and installation.
32Design and construction of a TEG (Triethylene Glycol) regeneration skid intended to regenerate the exhausted glycol used in gas treatment processes. The supply comprises an integrated system including process equipment, mechanical components, piping, instrumentation and a supporting structure with access facilities for inspection and maintenance.
33Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
34Details, construction and installation engineering, material supply, fabrication, transportation of 1 Compression Module, offshore installation and commissioning.
35Supply of three lead handling and melting tanks, specifically designed and manufactured for nuclear application within the AMR2 BEIS Advanced Modular Reactor project. The system comprises a Primary Tank (S101), a Storage Tank (S300) and a Melting Tank (S400), manufactured in 316L stainless steel and designed for temperatures up to +450 °C. The equipment has been classified under different PED categories according to its respective design conditions. The project scope included project management, engineering, material supply, fabrication, certification, installation and As-Built documentation.
36Supply of five pressure vessels for ENI Venice Refinery: Dihydrogen (H2) Addition Vessel, Blow Down Equipment, Pressure Delivery Damper, Stripper O/H Gas Separator and Water Stripper. The equipment was manufactured primarily in ASTM A 516 Gr. 60, with additional components and materials in ASTM A 105 and ASTM A 106, according to the specifications of each item. The project scope included project management, engineering, material supply, fabrication, certification and As-Built documentation.
37Supply of three items of equipment for the Maboqueiro Platform, as part of the Azule Energy Angola project: a Vent KO Drum Vessel in SA 240 316L stainless steel, a Diesel Fuel Storage Tank in ASTM A 516 Gr. 70 and a Launching Pig Trap in API 5L X65. The project scope included project management, engineering, material supply, fabrication, certification and installation of the equipment.
38Engineering, Procurement, and Construction of the complete platform: Jacket, Deck, Flare, 4 foundation piles, mechanical and piping systems, skids, power generation, cranes, E/I, painting, and insulation. Deck: 1,400 tons, Jacket: 2,400 tons, Piles: 1,600 tons
39Detailed, construction, and installation engineering, procurement, fabrication, load-out and rigging on cargo barge, transportation to site and installation, drilling support.
40The project involved the fabrication of the E-001 Shell and Tube heat exchanger for ENI Livorno Refinery. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, and As-Built Documentation.
41The project involved the fabrication of a concentrated sulphuric acid vessel in ASTM A516 Gr.60. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, and As-Built Documentation.
42The project involved the fabrication of two items of equipment for ENI Livorno Refinery: a Shell and Tube heat exchanger (E1) and a shell component (E2A). The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, and As-Built Documentation.
43Manufacturing of columns E-5502 and E-5501 for ENI Sannazzaro Refinery. The project scope included project management, engineering, material supply, fabrication and certification. Due to its considerable length, fabrication of column E-5501 was completed directly at the refinery. The two column sections were delivered to a dedicated area within the plant and subsequently assembled on site. Site activities included PWHT, NDT, final testing and painting.
44Material supply, prefabrication, structural restoration, and commissioning of the offshore SPM platform for API IP Falconara. Dismantling and reinstallation of topside structures, supply of new cabin, replacement of rotating bearing, and full painting.
45EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
46The project involved the fabrication of five vessels for the storage of foaming agent used in the fire-fighting system at ENI Versalis Porto Marghera site. The equipment was manufactured in carbon steel with a protective coating and divided into two dimensional configurations. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, and As-Built Documentation, in accordance with VSR and PdR 55:2019.
47Supply and fabrication of 4 foundation piles, control cabin, and structural frames for SPM buoy. Complete activities including installation, piping prefabrication, dismantling and reinstallation, commissioning, and start-up support.
48Tank maintenance, improvement and modification works at ENI Livorno Refinery.
49The project involved the engineering, material supply and fabrication of five skids for the chemical injection and fuel supply systems of ENI Congo's WHP2 offshore platform. The equipment includes one Hydrate Inhibitor Injection Skid, one Diesel Fuel Skid, one Chemical Injection Skid, one Corrosion Inhibitor Injection Skid and one Antiscale Injection Skid. The carbon steel structures were designed for operating pressures up to 379 barg and temperatures ranging from -5 °C to +70 °C.
50The project involved the supply of nine items of equipment for ENI Congo's WHP2 platform, including a Pig Launching/Receiving Trap, Diesel Fuel Storage Vessel, Test Separator, Vent KO Drum and storage tanks for water, inhibitors and other process chemicals. The equipment was manufactured in carbon steel and AISI 316L stainless steel, according to the specific application requirements. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation at Site and As-Built Documentation.
51The project involved the supply of nine items of equipment for ENI Congo's WHP2 platform, including a Pig Launching/Receiving Trap, Diesel Fuel Storage Vessel, Test Separator, Vent KO Drum and storage tanks for water, inhibitors and other process chemicals. The equipment was manufactured in carbon steel and AISI 316L stainless steel, according to the specific application requirements. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation at Site and As-Built Documentation.
52The project involved the fabrication of vessel VS-4102-B, designed for vapour accumulation in the distillation and condensation process at ENI Versalis Crescentino plant. The equipment was manufactured in AISI 304 stainless steel. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, and As-Built Documentation, in accordance with ASME VIII Division 1 and PED.
53SOW: EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
54EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
55EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
56Demolition and EPC of Tank TF – Tank S1B
57Construction of the complete oil platform: Jacket, Deck, Flare, 6 piles, piping, chemical and process skids, E/I systems, generator sets, cranes, painting and insulation, onshore testing, and transportation to site. Deck: 1,450 tons, Jacket: 580 tons, Piles: 610 tons.
58Supply of materials, prefabrication and installation of structures, painting, mechanical inspection, and transport by barge to the final site. Weight of the dry dock basin: 850 tons, structural demolition and replacement: 50 tons.
59Supply and commissioning of process skids for ENI offshore platforms in the Central Italy District.
60Execution of multidisciplinary works, well connections and mechanical, electrical and instrumentation installations at ENI Congo sites.
61The project involved the fabrication of five items of equipment for ENI Mexico's Onshore Receiving Facility (ORF) in Tabasco, comprising one Fire Water Tank, one Vent KO Drum and three Separators. All equipment was manufactured in SA516 Gr.70 carbon steel, with different dimensions and specified thicknesses. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation at Site and As-Built Documentation.
62Fabrication of DN4000mm rotating bearing system, prefabricated E/I cabin (15 tons), PMCC/ICSS/UPS panels, HVAC. Onshore testing, maritime transport, offshore installation, and commissioning. Includes dismantling of existing structure. New topside: 130 tons.
63Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
64Construction engineering, supply of structural materials for JACKET, DECK, and flare, provided in prefabricated elements (legs, joints, piping, plates, beams, gratings, etc.). Total weight: 2,450 tons.
65The project involved the fabrication of seven equipment types for ENI Congo's WHP4 Platform, comprising an Open Drains Vessel, a Crane Diesel Storage Vessel and several storage tanks for process chemicals and additives. The equipment was manufactured from SA516 Gr.70 carbon steel and stainless steel, according to the intended service. Design conditions reach a pressure of 3.5 barg and a temperature of 70 °C. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation and As-Built Documentation.
66The project involved the fabrication of a Water Condensate Separator, identified as Item 60-320-CQ-102, for MELLITAH O&G's Sabratha Platform. The equipment was manufactured from carbon steel with 3 mm Inconel 625 internal cladding. It was designed for a pressure of 29.0 barg and a temperature of 106 °C. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification and As-Built Documentation.
67The project involved the fabrication of a Degaser, identified as Item 560-VH-001, for ENI SPA's Arianna Platform. The equipment was manufactured from SA516 Gr.70 carbon steel, with an internal diameter of 1,090 mm and a tangent-to-tangent (T.L.-T.L.) length of 2,710 mm. It was designed for a pressure of 350.0 barg and a temperature of 100 °C.
68The project involved the fabrication of two Production Hydrocyclones, identified as Item 60-560-VZ-103-A/B, for the Sabratha Platform in Libya. The equipment was manufactured from Inconel 625 and designed to operate at a pressure of 29.0 barg and a temperature of 106 °C. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification and As-Built Documentation.
69The project involved the fabrication of a Produced Water / Condensate treatment vessel, Item 60-560-VH-102, installed on the Oil Treatment Skid of the Sabratha offshore platform. The equipment was designed for sour service and manufactured from SA516 Gr.70N carbon steel with a Belzona 1391T coating. The design conditions specify a pressure of 3.5 barg and a temperature of 106 °C.
70The project involved the fabrication of a Degaser, identified as Item 560-VH-001, for ENI SPA's Barbara C Platform. The equipment was manufactured from SA516 Gr.70 carbon steel, with an internal diameter of 1,110 mm and a length of 3,650 mm. It was designed for a pressure of 95.0 barg and a temperature of 100 °C.
71The project involved the fabrication of a New Compact Flotation Unit (CFU), Item 60-320-VV-102, for the Sabratha Platform in Libya, under the FJORDS ENGINEERING/NOV contract for MELLITAH O&G. The equipment, designed for sour service, is manufactured from SA516 Gr.70N carbon steel with a Belzona 1391T internal coating. It was designed for a pressure of 29.0 barg and a temperature of 106 °C, with steam-out conditions specified as full vacuum at 125 °C.
72SOW: Maintenance on floating roof 13-TK2 storage tank - engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
73EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
74Engineering, procurement, fabrication and transport to site of no.1 fully equipped E/I shelter, weighing 25 tons, A60 insulation rating.
75Supply and transport to site of the following items: no.1 launching scraper trap, no.3 chemical skids including chemical storage tanks, no.1 WHCP, no.1 platform crane, no.1 SDV 0190 valve.
76Construction of pressure equipment and oil treatment skid to be installed on the SABRATHA platform, for the upgrade of the associated treatment facility.
77Supply of materials and multidisciplinary services for modification and improvement works at ENI onshore and offshore facilities in the North District.
78Supply of materials and multidisciplinary services for modification and improvement works at Adriatica Idrocarburi's onshore and offshore facilities.
79Supply of materials and multidisciplinary services for modification and improvement works at ENI facilities in the North and Central Italy Districts.
80The project involved the fabrication of a Test Separator, identified as Item TS-101-A, for ENI Congo's DP5 Platform. The equipment was manufactured from SA516 Gr.70 carbon steel, with an internal diameter of 1,500 mm and a length of 6,170 mm. It was designed for a pressure of 60.0 barg and a temperature of 50 °C.
81The project involved the engineering and supply of five items of equipment for three-phase process water treatment, intended for ENI SPA's CALIPSO/CERVIA A and BARBARA D platforms. The supply comprised one Degasser, two Skimmers, including one complete with skid, and two Coalescer Filters. Engineering services included process calculation verification, General Arrangement preparation, Construction Drawings and Installation Drawings.
82Three phases: refurbishment of existing Jacket and Deck in Louisiana (USA) and transport to Congo; prefabrication in Italy of 4+2 piles, landing platform, and equipment; final Topside integration in Congo with offshore commissioning. Deck: 1,100 tonnes, Jacket: 500 tonnes, Piles: 650 tonnes.
83Refurbishment of 5 port vessels (GP56, GP57, GP58, GP61, GP66) operating at the La Spezia Naval Arsenal: thickness inspections, structural renewal, restoration of electrical and ballast systems, sandblasting, painting, and delivery to the client.
84No. 8 modules for Diesel Isothermic Hydrotreater and loose piping for the Tarasovskoe Field, Rosneft, Russian Federation.
85Prefabrication and testing of 11 SKIDS and LOOSE PIPING for the SILICA GEL SYSTEM Project – Train SKIDs 6-7-8 – Petrobel Zohr Field, Egypt.
86Manufacture of various types of process separators for the Bordolano Gas Storage Field in Italy. The contract included 1st and 2nd Stage Suction Gas Separators, Gas/Liquid Separators, and Well Head Separators. The project scope covered management, engineering and calculations, material supply, equipment fabrication and certification, and As-Built documentation.
87Manufacture of second-stage Suction Gas Separators, identified by tag 360-1/2/3-VN-002, for the Bordolano Gas Storage Field in Italy. The project scope included project management, engineering and calculations, material supply, equipment fabrication and certification, and As-Built documentation.
88Manufacture of first-stage Suction Gas Separators, identified by tag 360-1/2/3-VN-001, for the Bordolano Gas Storage Field in Italy. The project scope included project management, engineering and calculations, material supply, equipment fabrication and certification, and As-Built documentation.
89Manufacture of a Launching Trap, Item 01-190-0-VL-001, for installation on the Litchendjili Platform, located in Pointe-Noire, Republic of the Congo. The project scope included project management, engineering and calculations, material supply, equipment fabrication and certification, installation, and As-Built documentation.
90Supply and installation of process equipment for the Bonaccia Platform as part of the Integrated Deck Bonaccia NW project. The contract included Gas Separators, an Oily Water Degaser, and a Launching Trap. The scope covered project management, engineering and calculations, material supply, fabrication and certification, installation, and As-Built documentation.
91Manufacture of Gas Separators, identified by tags 00-300-0-VS-001/008, for installation on the Bonaccia Platform in Italy. The project scope included management, engineering and calculations, material supply, equipment fabrication and certification, installation, and As-Built documentation.
92Manufacture of two combustible gas filters, identified by tags 0-420-0-CL001-A/B, for installation on the Bonaccia Platform in Italy. The project scope included management, engineering and calculations, material supply, equipment fabrication and certification, installation, and As-Built documentation.
93Manufacture of a Launching Trap, Item 01-190-0-VL-001, for installation on the Bonaccia Platform in Italy. The project scope included project management, engineering and calculations, material supply, equipment fabrication and certification, installation, and As-Built documentation.
94Manufacture of an Oily Water Degaser, Item 00-560-0-VH-001, for installation on the Bonaccia Platform in Italy. The project scope included project management, engineering, material supply, equipment fabrication and certification, installation, and As-Built documentation.
95The project involved the fabrication of a Liquid/Gas Separator, identified as Item V-01N, for ENI Versalis' Elastomers Plant. The equipment was manufactured from stainless steel (SS Inox), with an internal diameter of 950 mm and a tangent-to-tangent (T.L.-T.L.) length of 1,950 mm. It was designed for a pressure of 12.0 barg and a temperature of 160 °C. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification and As-Built Documentation.
96The project involved the fabrication of a High Efficiency Separator, identified as Item 300-AVS-101, for STOGIT's Cortemaggiore Facility. The equipment was manufactured from SA516 Gr.70 carbon steel, with an internal diameter of 1,500 mm and a length of 5,650 mm. It was designed for a pressure of 9.0 barg and a temperature of 70 °C. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification and As-Built Documentation.
97The project involved the engineering and supply of eleven Pressure Vessels for sour service, intended for several process units at ENI Livorno Refinery. The equipment was assigned to MEROX, PLAT, Stab A, Topping, VPS and MEK1 plant services, as well as the GPL washing system with DEA and the exhausted sodium hydroxide treatment system. Engineering activities included Detailed Engineering, VSR calculations, General Arrangement development and preparation of Construction Drawings and Installation Drawings. The supply comprised eleven pressure vessels, with individual weights ranging from 343 kg to 18,254 kg.
98The project involved the supply of a Reactor R-1001A for the HF3 Plant at ENI's Livorno Refinery, intended for hydrocarbon treatment. The equipment, weighing 21,000 kg, was manufactured from ASTM A387 Gr.11 steel with A347 cladding. The reactor was designed for a pressure of 110 barg and a temperature of 336 °C. The project included process calculation verification, General Arrangement development, preparation of construction and installation drawings, equipment supply and IIS construction supervision.
99Engineering and construction of the complete deck (structure, flare, mechanical and piping systems, skids, E/I, painting and insulation), E/I shelters, pre-commissioning, load-out and lifting, transportation, and commissioning up to start-up support. Deck weight: 900 tonnes.
100Supply of 1 Glycol Regeneration Skid with BEU-BET Heat Exchanger – ENI M'Boundi Field, Congo.
101Supply of 1 gas/liquid separator for the ENI Versalis elastomers plant – Ravenna.
102Execution of multidisciplinary works covering well connections, mechanical, piping, electrical, instrumentation and automation installations at ENI Congo sites.
103Manufacture of the Stripping Gas Column, Item 02-320-1-VE-001, for the Condensate Recovery Unit at M’Boundi Field. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation and As-Built Documentation.
104Manufacture of the Stripped Gas Compressor Discharge Scrubber, Item 02-360-1-VN-006, for the Condensate Recovery Unit at M’Boundi Field, Republic of Congo. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation and As-Built Documentation
105Manufacture of a Cold Drum Separator, Item 02-320-1-VN-001, for the Condensate Recovery Unit at the M’Boundi Field, Republic of the Congo. The project scope included project management, engineering and calculations, material supply, equipment fabrication and certification, installation, and As-Built documentation.
106The project involved the engineering, fabrication and supply of multiple storage tanks for chemical injection applications, together with a diesel storage vessel, for ENI Congo's NENE’ AEP Platform in the Republic of Congo.
107Manufacture of chemical storage tanks for the Chemical Injection systems on the NENE’ AEP Platform, Republic of the Congo, together with a Diesel Storage Vessel. The project scope included project management, engineering and calculations, material supply, equipment fabrication and certification, installation, and As-Built documentation.
108EPCI – Revamping of the Active Fire-fighting System at M’Boundi Plant, Congo, including the construction of a 184 m³ firewater storage tank.
109Complete deck construction (structure, flare, mechanical systems and piping, skids, packages, E/I, painting and insulation), E/I shelters, onshore pre-commissioning, load-out, transportation, and hook-up/commissioning up to start-up support. Deck weight: 900 tonnes.
110EPCI contract for the revamp of the active fire protection system at the M'Boundi facility, Congo.
111EPC contract for the construction of 1 C.R.U. (Condensate Recovery Unit) onshore at the M'Boundi field, Congo. Design capacity: 3.2 MMSCMD.
112Supply of 1 High Efficiency Separator, item 300-AVS-101, for SNAM Rete Gas/Technip – Cortemaggiore, Italy.
113Supply of the Gas Stripping Column and 1 TEG regeneration package for SOGARA, Gabon. Maximum capacity: 200 m³/day.
114Supply of materials and multidisciplinary services for modification and improvement works at ENI facilities in the North and Central Italy Districts.
115Supply of materials and multidisciplinary services for modification and improvement works at Adriatica Idrocarburi's onshore and offshore facilities.
116Manufacture of Column Item 6623-CA1 for the Azeotropic Azeosolve Distillation plant at the Ravenna Petrochemical Site. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification and As-Built Documentation.
117Complete Deck construction (structure, Flare, mechanical systems and piping, packages, E/I, HVAC, helideck, compression module), pre-commissioning, transportation, and commissioning of 6+2 oil and gas wells. Total Deck: 2,400 tons (Process Deck 1,900, Accommodation 200, Compression 300).
118Supply of dehydration columns CA1 - CB103 for the Ravenna petrochemical plant.
11970-PAX accommodation module for offshore platform.
120Manufacture of the “Dissolution” Reactor R-103A for Polimeri Europa’s industrial site in Ferrara, Italy. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification and As-Built Documentation.
121Fabrication of 12 anchor points and anchor blocks, 12 towers, foundations, and casing piles for the wreck removal at Giglio Island. Total weight of fabricated and supplied structures: 850 tonnes.
122Supply of 1 steel storage tank (220-VA-101) for the Gagliano Gas Center.
123Supply of 4 glycol regeneration units for the Sergnano Gas Center. Maximum wet glycol treatment capacity: 204 m³/day.
124Revamp of the dehydration column at the Fiume Triste Gas Center. Installation of Koch-Glitsch internal structured packing. Column Ø: 3,000 mm | Length: 18,000 mm.
125Complete platform construction: Monopod, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I, painting and insulation. Includes testing and pre-commissioning, load-out, transportation, and commissioning up to start-up. Weights: Deck: 500 tons, Jacket: 350 tons, Piles: 300 tons.
126FABBRICAZIONE di n.6 moduli completi di strutture in acciaio relativi ai moduli di compressione, inclusi carico, fissaggio in mare e trasporto allo yard di montaggio finale. Peso di ogni modulo fabbricato: 1000 tonnellate
127Fornitura e installazione della colonna di disidratazione 5209C1101 per la Raffineria di Gela. Materiale: SA 516 Gr. 60 + rivestimento interno AISI 316L.
128Supply of glycol regeneration skid for the Gaz du Sud project – ENI Tunisia. Capacity: 2,500,000 Sm³/day.
129Fabrication of 6 complete steel structure modules related to the compression modules, including load-out, lifting, and transportation to the final assembly yard. Weight of each fabricated module: 1000 tonnes.
130Manufacture of Fractionator Column 5209 C-1101N for ENI's industrial site in Gela, Italy. The equipment features a carbon steel base material, stainless steel internal cladding and AISI 316L internals. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification and As-Built Documentation.
131Complete construction of 3 platforms (ANA, VESNA, IRINA) including Monopile, Decks, Flare, piles, mechanical systems, piping, and E/I. Built between Lerici (Italy) and Bakar (Croatia). Platform weights: Deck 500 tons, Monopod 450 tons, Pile 350 tons.
132Fabrication of offshore structures related to the Drilling Tower to be assembled and installed on the Scarabeo 8 platform at the Fincantieri shipyard in Palermo. Structure weight: 750 tonnes.
133Maintenance contract for gasoline storage tanks T1, T2 and T3 at ENIMED's Bronte Oil Center, including engineering, material supply, prefabrication, site erection, pre-commissioning and commissioning.
134EPC CONTRACT FOR N. 2 GLYCOL REGENERATION SKIDS 200 m³/d FOR THE C.LE GAS SABBIONCELLO.
135Simultaneous construction of 2 raw gas injection barges (95 m x 16 m x 15 m) with structural steel of 1,000 tons each, mechanical systems of 730 tons, GE compressors, and over 240 km of electrical and control cables.
136Supply of 2 TEG regenerators with a capacity of 200 m³/day for the Ravenna Mare Gas Station.
137Construction of IVANA K compression platform (Jacket, Deck, Flare, piles, E/I, control room) and IVANA C platform (Monopile, Deck, Flare). Includes revamping of IVANA A and IVANA B. IVANA K: Deck 1,800 tons, Jacket 750 tons. IVANA C: Deck 230 tons, Jacket 320 tons.
138Construction of the Flare for the Sabratha Platform (140 meters long), connection to the K.O. Drum and associated blowdown line with H90 fire protection. Flare weight: 750 tons.
139Maintenance contract for storage tank 42-TK1-A at ENI's Trecate Oil Center, including engineering, material supply, prefabrication, site erection, pre-commissioning and commissioning. The tank has an internal diameter of 6,000 mm.
140Construction of complete platform: Monopile, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I, painting and insulation. Testing, pre-commissioning, load-out, transportation, and commissioning. Deck: 230 tons, Jacket: 320 tons, Piles: 280 tons.
141Construction of complete platform: Jacket, Deck, Flare, piles, mechanical and piping systems, E/I, accommodation module (4 persons), testing and commissioning. Includes revamping of the onshore power plant. Deck: 800 tons, Jacket: 700 tons, Piles: 600 tons.
142Construction of complete platform: Monopile, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I, painting and insulation. Testing and pre-commissioning, load-out, transportation, and commissioning up to start-up. Deck: 500 tons, Jacket: 350 tons, Piles: 300 tons.
143Supply of equipment for Gagliano Gas Center: Gas Heater Skid, absorber columns, stabilization columns, separators, heat exchangers.
144Construction of compression platform: Jacket, Deck, Flare, piles, mechanical and piping systems, skids, E/I, technical rooms, control room. Testing, pre-commissioning, transportation, and commissioning up to start-up. Deck: 2,000 tons, Jacket: 800 tons, Piles: 500 tons.
145Construction of compression platform: Jacket, Deck, Flare, piles, mechanical and piping systems, skids, E/I, technical rooms, control room. Testing, pre-commissioning, transportation, and commissioning up to start-up. Deck: 2,000 tons, Jacket: 800 tons, Piles: 500 tons.
146Fornitura nr. 1 skid rigeneratore di glicole con scambiatore di calore BEU-BET – Manara, Italia. Dimensioni: 12 m x 2,5 m, peso totale 25.000 kg.
147Fornitura skid rigenerazione glicole: 2 rigeneratori DEG da 20 m³/giorno e 2 rigeneratori TEG da 200 m³/giorno per la Centrale Fano.