01FANO PLANT REVAMPING ACTIVITIES
The scope of work consists of the revamping of the Fano station
76 projects
01The scope of work consists of the revamping of the Fano station
02EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
03EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
04EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
05EPC contract for demolition of items
06EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
07EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
08EPC contract for the complete construction of platforms (monopod, deck, flare, piles, mechanical systems, piping, E/I, painting), including onshore testing, transport to site, hook-up, and commissioning up to start-up. The contract also includes the revamping of the existing Izabela platform.
09EPCIC contract for engineering, procurement, construction, transportation, and installation of a complete platform: 4-leg Jacket (6,500 tons), 8 piles (4,500 tons), Topside (7,500 tons), Living Quarters (900 tons), and FMWR (3,000 tons). Installation in the Mediterranean Sea, 120 km offshore.
10Project Engineering, Procurement and Construction of the WHPA platform Living Quarters, supply of mechanical components and piping systems, process skids and packages, installation of electrical and instrumentation systems.
11Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
12Details, construction and installation engineering, material supply, fabrication, transportation of 1 Compression Module, offshore installation and commissioning.
13Engineering, Procurement, and Construction of the complete platform: Jacket, Deck, Flare, 4 foundation piles, mechanical and piping systems, skids, power generation, cranes, E/I, painting, and insulation. Deck: 1,400 tons, Jacket: 2,400 tons, Piles: 1,600 tons
14Detailed, construction, and installation engineering, procurement, fabrication, load-out and rigging on cargo barge, transportation to site and installation, drilling support.
15Material supply, prefabrication, structural restoration, and commissioning of the offshore SPM platform for API IP Falconara. Dismantling and reinstallation of topside structures, supply of new cabin, replacement of rotating bearing, and full painting.
16EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
17Supply and fabrication of 4 foundation piles, control cabin, and structural frames for SPM buoy. Complete activities including installation, piping prefabrication, dismantling and reinstallation, commissioning, and start-up support.
18Within the open contract, several activities have been awarded to Gruppo Antonini for maintenance or modifications of existing tanks.
19EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
20EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
21EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
22EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
23Demolition and EPC of Tank TF – Tank S1B
24Construction of the complete oil platform: Jacket, Deck, Flare, 6 piles, piping, chemical and process skids, E/I systems, generator sets, cranes, painting and insulation, onshore testing, and transportation to site. Deck: 1,450 tons, Jacket: 580 tons, Piles: 610 tons.
25Supply of materials, prefabrication and installation of structures, painting, mechanical inspection, and transport by barge to the final site. Weight of the dry dock basin: 850 tons, structural demolition and replacement: 50 tons.
26FABRICATION of the rotating bearing system (DN4000mm rotating bearing, piping, equipment, electrical/instrumentation system, painting) including prefabricated E/I cabin (15 tons), PMCC/ICSS/UPS panels, batteries, HVAC system, etc., onshore testing and pre-commissioning, offshore load-out and rigging, maritime transport, offshore lifting, installation, tie-ins, and commissioning up to start-up. The activity included dismantling of the existing rotating bearing and associated structures and piping.
27Fabrication of DN4000mm rotating bearing system, prefabricated E/I cabin (15 tons), PMCC/ICSS/UPS panels, HVAC. Onshore testing, maritime transport, offshore installation, and commissioning. Includes dismantling of existing structure. New topside: 130 tons.
28Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
29Construction engineering, supply of structural materials for JACKET, DECK, and flare, provided in prefabricated elements (legs, joints, piping, plates, beams, gratings, etc.). Total weight: 2,450 tons.
30Maintenance on floating roof 13-TK2 storage tank - engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
31EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
32Engineering, procurement, fabrication and transport to site of no.1 fully equipped E/I shelter, weighing 25 tons, A60 insulation rating.
33Supply and transport to site of the following items: no.1 launching scraper trap, no.3 chemical skids including chemical storage tanks, no.1 WHCP, no.1 platform crane, no.1 SDV 0190 valve.
34Construction of pressure equipment and oil treatment skid to be installed on the SABRATHA platform, for the upgrade of the associated treatment facility.
35Three phases: refurbishment of existing Jacket and Deck in Louisiana (USA) and transport to Congo; prefabrication in Italy of 4+2 piles, landing platform, and equipment; final Topside integration in Congo with offshore commissioning. Deck: 1,100 tonnes, Jacket: 500 tonnes, Piles: 650 tonnes.
36Refurbishment of 5 port vessels (GP56, GP57, GP58, GP61, GP66) operating at the La Spezia Naval Arsenal: thickness inspections, structural renewal, restoration of electrical and ballast systems, sandblasting, painting, and delivery to the client.
37No. 8 modules for Diesel Isothermic Hydrotreater and loose piping for the Tarasovskoe Field, Rosneft, Russian Federation.
38Prefabrication and testing of 11 SKIDS and LOOSE PIPING for the SILICA GEL SYSTEM Project – Train SKIDs 6-7-8 – Petrobel Zohr Field, Egypt.
39Engineering and construction of the complete deck (structure, flare, mechanical and piping systems, skids, E/I, painting and insulation), E/I shelters, pre-commissioning, load-out and lifting, transportation, and commissioning up to start-up support. Deck weight: 900 tonnes.
40Supply of 1 Glycol Regeneration Skid with BEU-BET Heat Exchanger – ENI M'Boundi Field, Congo.
41Supply of 1 gas/liquid separator for the ENI Versalis elastomers plant – Ravenna.
42EPCI contract for Active Fire-fighting system revamping, relevant to the M’Boundi Plant - Congo
43Complete deck construction (structure, flare, mechanical systems and piping, skids, packages, E/I, painting and insulation), E/I shelters, onshore pre-commissioning, load-out, transportation, and hook-up/commissioning up to start-up support. Deck weight: 900 tonnes.
44EPCI contract for the revamp of the active fire protection system at the M'Boundi facility, Congo.
45EPC contract for the construction of 1 C.R.U. (Condensate Recovery Unit) onshore at the M'Boundi field, Congo. Design capacity: 3.2 MMSCMD.
46Supply of 1 High Efficiency Separator, item 300-AVS-101, for SNAM Rete Gas/Technip – Cortemaggiore, Italy.
47Supply of the Gas Stripping Column and 1 TEG regeneration package for SOGARA, Gabon. Maximum capacity: 200 m³/day.
48Complete Deck construction (structure, Flare, mechanical systems and piping, packages, E/I, HVAC, helideck, compression module), pre-commissioning, transportation, and commissioning of 6+2 oil and gas wells. Total Deck: 2,400 tons (Process Deck 1,900, Accommodation 200, Compression 300).
49Supply of dehydration columns CA1 - CB103 for the Ravenna petrochemical plant.
5070-PAX accommodation module for offshore platform.
51Fabrication of 12 anchor points and anchor blocks, 12 towers, foundations, and casing piles for the wreck removal at Giglio Island. Total weight of fabricated and supplied structures: 850 tonnes.
52Supply of 1 steel storage tank (220-VA-101) for the Gagliano Gas Center.
53Supply of 4 glycol regeneration units for the Sergnano Gas Center. Maximum wet glycol treatment capacity: 204 m³/day.
54Revamp of the dehydration column at the Fiume Triste Gas Center. Installation of Koch-Glitsch internal structured packing. Column Ø: 3,000 mm | Length: 18,000 mm.
55Complete platform construction: Monopod, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I, painting and insulation. Includes testing and pre-commissioning, load-out, transportation, and commissioning up to start-up. Weights: Deck: 500 tons, Jacket: 350 tons, Piles: 300 tons.
56FABBRICAZIONE di n.6 moduli completi di strutture in acciaio relativi ai moduli di compressione, inclusi carico, fissaggio in mare e trasporto allo yard di montaggio finale. Peso di ogni modulo fabbricato: 1000 tonnellate
57Fornitura e installazione della colonna di disidratazione 5209C1101 per la Raffineria di Gela. Materiale: SA 516 Gr. 60 + rivestimento interno AISI 316L.
58Supply of glycol regeneration skid for the Gaz du Sud project – ENI Tunisia. Capacity: 2,500,000 Sm³/day.
59Fabrication of 6 complete steel structure modules related to the compression modules, including load-out, lifting, and transportation to the final assembly yard. Weight of each fabricated module: 1000 tonnes.
60Complete construction of 3 platforms (ANA, VESNA, IRINA) including Monopile, Decks, Flare, piles, mechanical systems, piping, and E/I. Built between Lerici (Italy) and Bakar (Croatia). Platform weights: Deck 500 tons, Monopod 450 tons, Pile 350 tons.
61Fabrication of offshore structures related to the Drilling Tower to be assembled and installed on the Scarabeo 8 platform at the Fincantieri shipyard in Palermo. Structure weight: 750 tonnes.
62Maintenance on T1-T2-T3 storage tanks for gasoline - BRONTE oil center
63EPC CONTRACT FOR N. 2 GLYCOL REGENERATION SKIDS 200 m³/d FOR THE C.LE GAS SABBIONCELLO.
64Simultaneous construction of 2 raw gas injection barges (95 m x 16 m x 15 m) with structural steel of 1,000 tons each, mechanical systems of 730 tons, GE compressors, and over 240 km of electrical and control cables.
65Supply of 2 TEG regenerators with a capacity of 200 m³/day for the Ravenna Mare Gas Station.
66Construction of IVANA K compression platform (Jacket, Deck, Flare, piles, E/I, control room) and IVANA C platform (Monopile, Deck, Flare). Includes revamping of IVANA A and IVANA B. IVANA K: Deck 1,800 tons, Jacket 750 tons. IVANA C: Deck 230 tons, Jacket 320 tons.
67Construction of the Flare for the Sabratha Platform (140 meters long), connection to the K.O. Drum and associated blowdown line with H90 fire protection. Flare weight: 750 tons.
68Maintenance on 42-TK1-A storage tank - TRECATE oil center.
69Construction of complete platform: Monopile, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I, painting and insulation. Testing, pre-commissioning, load-out, transportation, and commissioning. Deck: 230 tons, Jacket: 320 tons, Piles: 280 tons.
70Construction of complete platform: Jacket, Deck, Flare, piles, mechanical and piping systems, E/I, accommodation module (4 persons), testing and commissioning. Includes revamping of the onshore power plant. Deck: 800 tons, Jacket: 700 tons, Piles: 600 tons.
71Construction of complete platform: Monopile, Deck, Flare, foundation piles, mechanical and piping systems, skids, E/I, painting and insulation. Testing and pre-commissioning, load-out, transportation, and commissioning up to start-up. Deck: 500 tons, Jacket: 350 tons, Piles: 300 tons.
72Supply of equipment for Gagliano Gas Center: Gas Heater Skid, absorber columns, stabilization columns, separators, heat exchangers.
73Construction of compression platform: Jacket, Deck, Flare, piles, mechanical and piping systems, skids, E/I, technical rooms, control room. Testing, pre-commissioning, transportation, and commissioning up to start-up. Deck: 2,000 tons, Jacket: 800 tons, Piles: 500 tons.
74Construction of compression platform: Jacket, Deck, Flare, piles, mechanical and piping systems, skids, E/I, technical rooms, control room. Testing, pre-commissioning, transportation, and commissioning up to start-up. Deck: 2,000 tons, Jacket: 800 tons, Piles: 500 tons.
75Fornitura nr. 1 skid rigeneratore di glicole con scambiatore di calore BEU-BET – Manara, Italia. Dimensioni: 12 m x 2,5 m, peso totale 25.000 kg.
76Fornitura skid rigenerazione glicole: 2 rigeneratori DEG da 20 m³/giorno e 2 rigeneratori TEG da 200 m³/giorno per la Centrale Fano.