C71 – ENI SPA – DEA REGENERATING COLUMN FOR SANNAZZARO REFINERY
Engineering, supply, fabrication and installation of a DEA Regenerating Column for Sannazzaro Refinery, Italy.
Location
Sannazzaro
Year / Duration
2024
Installation Site: Sannazzaro Refinery, Italy. Equipment Type: DEA Regenerating Column. Scope of Work: Project Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation, As-Built Documentation. Equipment Technical Specifications: Main Material: SA 516 Gr. 60. Internal Lining: SA 240 316L, including internal process plates. Internal Diameter (Øint): 1,800 mm. Length: 26,500 mm. Weight: 46,833 kg. Design Conditions: Project Pressure: 3.43 bar. Project Temperature: -15 / +150 °C. Applicable Codes and Standards: EN 13445. PED (Pressure Equipment Directive).
Other Related Projects

C1331 – ENI SPA – COLUMNS E-5502 & E-5501 FOR SANNAZZARO REFINERY
Manufacturing of columns E-5502 and E-5501 for ENI Sannazzaro Refinery. The project scope included project management, engineering, material supply, fabrication and certification. Due to its considerable length, fabrication of column E-5501 was completed directly at the refinery. The two column sections were delivered to a dedicated area within the plant and subsequently assembled on site. Site activities included PWHT, NDT, final testing and painting.
View detail
JOB 977 - ENI SPA - REACTOR R-1001A FOR LIVORNO REFINERY HF3 PLANT
The project involved the supply of a Reactor R-1001A for the HF3 Plant at ENI's Livorno Refinery, intended for hydrocarbon treatment. The equipment, weighing 21,000 kg, was manufactured from ASTM A387 Gr.11 steel with A347 cladding. The reactor was designed for a pressure of 110 barg and a temperature of 336 °C. The project included process calculation verification, General Arrangement development, preparation of construction and installation drawings, equipment supply and IIS construction supervision.
View detail
JOB 899 – ENI CONGO – STRIPPING GAS COLUMN
Manufacture of the Stripping Gas Column, Item 02-320-1-VE-001, for the Condensate Recovery Unit at M’Boundi Field. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation and As-Built Documentation.
View detail