
C1331 – ENI SPA – COLUMNS E-5502 & E-5501 FOR SANNAZZARO REFINERY
Manufacturing of process columns for ENI Sannazzaro Refinery, including on-site assembly and completion of the E-5501 column.
Location
Sannazzaro
Year / Duration
2021
Installation Site: Sannazzaro de' Burgondi Refinery, Pavia, Italy Equipment Type: Process Columns E-5502 & E-5501 - Isostripper Column Scope of Work: Management, Engineering & Calculation, Material Supply, Fabrication & Certification, As-Built Documentation. Equipment Technical Specifications: Isostripper Column Material: ASTM A 516 Gr. 60 Internal diameter: 2,743 mm Length: 41,205 mm Weight: 82,569 kg Design Conditions: Design pressure: 13.72 barg Design temperature: -15 / +232 °C On-Site Fabrication and Installation Activities Delivery of the two E-5501 column sections to a dedicated area within the refinery On-site assembly of the two sections: PWHT (Post Weld Heat Treatment) NDT (Non-Destructive Testing) Final testing Painting Equipment Type: Depropanizer Column Equipment Technical Specifications: Material: ASTM A516 Gr.65 Internal Diameter: 1,680 mm Length: 2,475 mm Weight: 34,515 kg Design Conditions: Design Pressure: 24.2 barg Design Temperature: -15 / +146 °C
Other Related Projects

C71 – ENI SPA – DEA REGENERATING COLUMN FOR SANNAZZARO REFINERY
Supply of a DEA Regenerating Column for ENI's Sannazzaro Refinery, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is manufactured from SA 516 Gr. 60 carbon steel with an internal lining in SA 240 316L stainless steel, including internal process plates. Designed for a project pressure of 3.43 bar and a project temperature range of -15 °C to +150 °C, in accordance with EN 13445 and PED requirements.
View detail
JOB 977 - ENI SPA - REACTOR R-1001A FOR LIVORNO REFINERY HF3 PLANT
The project involved the supply of a Reactor R-1001A for the HF3 Plant at ENI's Livorno Refinery, intended for hydrocarbon treatment. The equipment, weighing 21,000 kg, was manufactured from ASTM A387 Gr.11 steel with A347 cladding. The reactor was designed for a pressure of 110 barg and a temperature of 336 °C. The project included process calculation verification, General Arrangement development, preparation of construction and installation drawings, equipment supply and IIS construction supervision.
View detail
JOB 899 – ENI CONGO – STRIPPING GAS COLUMN
Manufacture of the Stripping Gas Column, Item 02-320-1-VE-001, for the Condensate Recovery Unit at M’Boundi Field. The project scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation and As-Built Documentation.
View detail