JOB 1193 - ENI CONGO - PROCESS VESSELS AND STORAGE TANKS FOR WHP2 PLATFORM
Engineering, fabrication and installation of process equipment and storage tanks for the WHP2 offshore platform.
Location
Congo
Year / Duration
2019
For detailed information on each of the nine individual equipment items included in this package, please refer to the dedicated project pages listed below: https://www.gruppoantonini.it/projects/135
Other Related Projects

C15 – ENI – TEG REGENERATION SKID FOR CROTONE SITE
Design and construction of a TEG (Triethylene Glycol) regeneration skid intended to regenerate the exhausted glycol used in gas treatment processes. The supply comprises an integrated system including process equipment, mechanical components, piping, instrumentation and a supporting structure with access facilities for inspection and maintenance.
View detail
JOB 1193 - ENI CONGO - PROCESS VESSELS AND STORAGE TANKS FOR WHP2 PLATFORM
The project involved the engineering, material supply and fabrication of five skids for the chemical injection and fuel supply systems of ENI Congo's WHP2 offshore platform. The equipment includes one Hydrate Inhibitor Injection Skid, one Diesel Fuel Skid, one Chemical Injection Skid, one Corrosion Inhibitor Injection Skid and one Antiscale Injection Skid. The carbon steel structures were designed for operating pressures up to 379 barg and temperatures ranging from -5 °C to +70 °C.
View detail
JOB 1193 – ENI CONGO – CHEMICAL INJECTION AND DIESEL STORAGE PACKAGE
The project involved the engineering, fabrication and supply of multiple storage tanks for chemical injection applications, together with a diesel storage vessel, for ENI Congo's NENE’ AEP Platform in the Republic of Congo.
View detail