Logo
GruppoAntonini
StoryDivisionsCommitmentProjects
StoryDivisionsCommitmentProjects
JOB 1193 - ENI CONGO - PROCESS VESSELS AND STORAGE TANKS FOR WHP2 PLATFORM
Back to projects
Package & skid

JOB 1193 - ENI CONGO - PROCESS VESSELS AND STORAGE TANKS FOR WHP2 PLATFORM

Engineering, fabrication and installation of process equipment and storage tanks for the WHP2 offshore platform.

Location

Congo

Year / Duration

2019

All projects
Project Description

Equipment Type: Injection Skids and Diesel Fuel Skid Equipment Technical Specifications: 1. Hydrate Inhibitor Injection Skid - Item 013900XY001: Material: Carbon Steel Length: 2,500 mm Width: 1,400 mm Height: 2,000 mm Weight: 2,600 kg Design Pressure: 259 barg Design Temperature: -5 / +70 °C 2. Diesel Fuel Skid - Item 014300XY001: Material: Carbon Steel Length: 1,400 mm Width: 2,500 mm Height: 2,000 mm Weight: 5,050 kg Design Pressure: 8 barg Design Temperature: -5 / +70 °C 3. Chemical Injection Skid - Item 011200XY001: Material: Carbon Steel (C.S.) Length: 4,500 mm Width: 3,000 mm Height: 1,600 mm Weight: 7,800 kg Design Pressure: 259 barg Design Temperature: -5 / +70 °C 4. Corrosion Inhibitor Injection Skid - Item 011200XY002: Material: Carbon Steel (C.S.) Length: 2,200 mm Width: 3,000 mm Height: 2,000 mm Weight: 5,500 kg Design Pressure: 259 barg Design Temperature: -5 / +70 °C 5. Antiscale Injection Skid - Item 011200XY003: Material: Carbon Steel (C.S.) Length: 2,200 mm Width: 3,000 mm Height: 2,000 mm Weight: 5,500 kg Design Pressure: 379 barg Design Temperature: -5 / +70 °C

Related

Other Related Projects

03
C15 – ENI – TEG REGENERATION SKID FOR CROTONE SITE

C15 – ENI – TEG REGENERATION SKID FOR CROTONE SITE

Design and construction of a TEG (Triethylene Glycol) regeneration skid intended to regenerate the exhausted glycol used in gas treatment processes. The supply comprises an integrated system including process equipment, mechanical components, piping, instrumentation and a supporting structure with access facilities for inspection and maintenance.

View detail
JOB 1193 - ENI CONGO - PROCESS VESSELS AND STORAGE TANKS FOR WHP2 PLATFORM

JOB 1193 - ENI CONGO - PROCESS VESSELS AND STORAGE TANKS FOR WHP2 PLATFORM

The project involved the supply of nine items of equipment for ENI Congo's WHP2 platform, including a Pig Launching/Receiving Trap, Diesel Fuel Storage Vessel, Test Separator, Vent KO Drum and storage tanks for water, inhibitors and other process chemicals. The equipment was manufactured in carbon steel and AISI 316L stainless steel, according to the specific application requirements. The scope included Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation at Site and As-Built Documentation.

View detail
JOB 1193 – ENI CONGO – CHEMICAL INJECTION AND DIESEL STORAGE PACKAGE

JOB 1193 – ENI CONGO – CHEMICAL INJECTION AND DIESEL STORAGE PACKAGE

The project involved the engineering, fabrication and supply of multiple storage tanks for chemical injection applications, together with a diesel storage vessel, for ENI Congo's NENE’ AEP Platform in the Republic of Congo.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231