Logo
GruppoAntonini
StoryDivisionsCommitmentProjects
StoryDivisionsCommitmentProjects
JOB 943 – ENI – INTEGRATED DECK CLARA NW – GAS SEPARATORS
Back to projects
Process equipment › Vessels

JOB 943 – ENI – INTEGRATED DECK CLARA NW – GAS SEPARATORS

Supply and installation of Gas Separators for the Bonaccia Platform.

Location

Italia

Year / Duration

2015

All projects
Project Description

Installation Site: Bonaccia Platform – Italy Equipment Type: Gas Separators – Item 00-300-0-VS-001/008 Scope of Work: Management, Engineering & Calculation, Material Supply, Fabrication & Certification, Installation, As-Built Documentation. Equipment Technical Specifications: Material: CS SA516 Gr.70 Specified thickness: 34 mm Internal diameter (Øint): 762 mm Length: 3,525 mm Design Conditions: Design pressure: 156.0 barg Design temperature: 70 °C

Related

Other Related Projects

03
C13 – ENI SPA – OIL STORAGE TANKS FOR ENIREWIND GELA

C13 – ENI SPA – OIL STORAGE TANKS FOR ENIREWIND GELA

Supply of three Oil Storage Tanks for the ENIREWIND site in Gela, as part of a project involving the recovery and reuse of equipment from CPI. The scope of work included project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. All three tanks are manufactured from EN 10025 S275 JR carbon steel, with a project pressure of 0.1 barg and a project temperature range of -5 °C to +40 °C, in accordance with API 650.

View detail
C91 – ENI CONGO – PIG LAUNCHING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

C91 – ENI CONGO – PIG LAUNCHING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

Supply of a 16”/12” Pig Launching Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.

View detail
C91 – ENI CONGO – PIG RECEIVING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

C91 – ENI CONGO – PIG RECEIVING TRAP FOR LITCHENDJILI TO DJENO PIPELINE

Supply of a 16”/12” Pig Receiving Trap for the Litchendjili-Djeno pipeline, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is designed for a project pressure of 71 bar and a temperature range of -5 °C to +85 °C, in accordance with ANSI B31.8 and ASME Section VIII, Division 1 for the Quick Opening Closure.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231