Location
Libia
Year / Duration
2003 · 2003
Construction of the Flare for the Sabratha Platform (140 meters long), connection to the K.O. Drum and associated blowdown line with H90 fire protection. The construction scope included supply of flare materials, fabrication of the grillage and rigging, load-out onto the transport barge, and transportation to the installation site. Flare weight: 750 tons.