Project Description

The first part of the scope of work involves the installation of the piping to connect the seawater line (converted into gas pipeline) between Cote Mateve, Mboundi Oil Centre of Eni Congo, and the GRS area at Litchendjili Onshore. Main activities include tie-ins, installation of valves (SDV and manual), dielectric joints, and pipeline welding. Civil works include excavation, foundation construction, and road reinstatement. Mechanical work concerns the connection of pipelines, support and integration of instrumentation, including ICSS system upgrades. Inspections, hydraulic testing, and final touch-ups are also part of the scope of work. The second part of the scope of work involves the removal of 24" valves along the 50 km of the seawater pipeline between Cote Mateve and Mboundi Oil Centre of Eni Congo. Main activities include dismantling the 6" valve bypasses, disconnecting and removing existing equipment, cutting and sealing the bypass welds, and replacing the valves with spools welded to the cuts on the 24" flanges. Operations include removal of automated valves. The EPC scope of work includes: • Project Management • FEED, Detailed and Construction Engineering • Material Procurement • Construction • Replacement, assembly, and installation of new systems • Mechanical Completion • Pre-Commissioning

Related

Other Related Projects

03
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning

View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.

View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231