Year / Duration

2021 · 2021 / 2022

All projects
Project Description

The Initial Phase includes the minimum required modifications within the onshore Litchendjili plant area to upgrade the gas capacity up to 4 MSCMD, avoiding vibration issues in lines and equipment. • Project Management, Engineering from FEED project validation up to the issuance of all necessary technical documentation, Procurement, Construction, Assembly and Installation, Mechanical Completion, and Pre-commissioning. • Replacement of the existing 12" spool (approx. 5 m) installed downstream of the receipt trap; • Assessment for revamping the internals of the existing gas KO drum (031990VA001): verification of demister details and inlet device, and replacement/upgrading; • Replacement of existing safety valves (190-PSV-003A/B), or calibrated orifice; • New 10" gas line from the existing gas KO drum to the existing export line (approx. 400 m); • Blowdown lines for new PCV, PSV, and BDV connections; • All connections required for new line tie-ins, including any hot tapping to avoid plant shutdown; • Installation of new fiscal gas meter and heaters; • New connection to the export line; • Blowdown connection. • HOT TAPPING connections with existing pipelines for tie-in with WHP4 platform and the CEC AREA.

Related

Other Related Projects

03
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning

View detail
REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.

View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231