EPC WHP4 OIL PTF REFURBISHMENT & TOPSIDE INTEGRATION – ENI CONGO
Back to projects
Offshore › Platforms

EPC WHP4 OIL PTF REFURBISHMENT & TOPSIDE INTEGRATION – ENI CONGO

ENI Congo

Location

Congo

Year / Duration

2016 · 2016/2018

All projects
Project Description

The contract includes three work phases: 1°) Refurbishment and enhancement of the existing Jacket and Deck structures in Louisiana (USA) and their transport from the origin site to Congo; 2°) Prefabrication in Italy at the GA shipyard of 4+2 foundation piles, landing platform, mechanical and piping equipment, skids, and packages; 3°) Final Topside integration in Congo, including offshore commissioning and hook-up. The Topside integration includes completion of the platform (enhancement of Jacket and Deck structures, flare completion, installation of mechanical and piping systems, skids, packages, E/I system, painting, and insulation), including onshore testing and pre-commissioning in Congo, offshore load-out and lifting, transportation to the installation site, hook-up, and commissioning up to start-up support. The contract also covers the separate fabrication of two two-level E/I cabins, including PMCC/ICSS/UPS switchboards, batteries, E/I systems, HVAC systems, etc. Weights: Deck: 1,100 tonnes, Jacket: 500 tonnes, Piles: 650 tonnes, E/I shelters: 80 tonnes.

Gallery
Related

Other Related Projects

03
IRENA 3 PTF – EPC CONTRACT FOR PLATFORM CONSTRUCTION – ED-INA

IRENA 3 PTF – EPC CONTRACT FOR PLATFORM CONSTRUCTION – ED-INA

EPC contract for the complete construction of platforms (monopod, deck, flare, piles, mechanical systems, piping, E/I, painting), including onshore testing, transport to site, hook-up, and commissioning up to start-up. The contract also includes the revamping of the existing Izabela platform.

View detail
EPCIC WHPA PLATFORM

EPCIC WHPA PLATFORM

EPCIC contract for engineering, procurement, construction, transportation, and installation of a complete platform: 4-leg Jacket (6,500 tons), 8 piles (4,500 tons), Topside (7,500 tons), Living Quarters (900 tons), and FMWR (3,000 tons). Installation in the Mediterranean Sea, 120 km offshore.

View detail
EPC MABOQUEIRO GAS PTF – ENI ANGOLA

EPC MABOQUEIRO GAS PTF – ENI ANGOLA

Engineering, Procurement, and Construction of the complete platform: Jacket, Deck, Flare, 4 foundation piles, mechanical and piping systems, skids, power generation, cranes, E/I, painting, and insulation. Deck: 1,400 tons, Jacket: 2,400 tons, Piles: 1,600 tons

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231