Design, fabrication and supply of Fractionator Column 5209 C-1101N for ENI's Gela Refinery.

Location

Gela

Year / Duration

2009

All projects
Project Description

Installation Site: Gela, Italy Equipment Type: Fractionator Column – Tag 5209 C-1101N Scope of Work: Management, Engineering & Calculation, Material Supply, Fabrication & Certification, As-Built Documentation. Equipment Technical Specifications: Base material: SA 516 Gr. 60 Cladding: SA 240 TP 316L Internals: AISI 316L Specified thickness: 17 + 3 mm Internal diameter (Øint): 2,135 / 1,525 mm Length: 30,600 mm Design Conditions: Design pressure: 3.5 barg Design temperature: 198 / 387 °C

Related

Other Related Projects

03
C71 – ENI SPA – DEA REGENERATING COLUMN FOR SANNAZZARO REFINERY

C71 – ENI SPA – DEA REGENERATING COLUMN FOR SANNAZZARO REFINERY

Supply of a DEA Regenerating Column for ENI's Sannazzaro Refinery, including project management, engineering and calculations, material supply, fabrication, certification, installation and As-Built documentation. The equipment is manufactured from SA 516 Gr. 60 carbon steel with an internal lining in SA 240 316L stainless steel, including internal process plates. Designed for a project pressure of 3.43 bar and a project temperature range of -15 °C to +150 °C, in accordance with EN 13445 and PED requirements.

View detail
C1331 – ENI SPA – COLUMNS E-5502 & E-5501 FOR SANNAZZARO REFINERY

C1331 – ENI SPA – COLUMNS E-5502 & E-5501 FOR SANNAZZARO REFINERY

Manufacturing of columns E-5502 and E-5501 for ENI Sannazzaro Refinery. The project scope included project management, engineering, material supply, fabrication and certification. Due to its considerable length, fabrication of column E-5501 was completed directly at the refinery. The two column sections were delivered to a dedicated area within the plant and subsequently assembled on site. Site activities included PWHT, NDT, final testing and painting.

View detail
JOB 977 - ENI SPA - REACTOR R-1001A FOR LIVORNO REFINERY HF3 PLANT

JOB 977 - ENI SPA - REACTOR R-1001A FOR LIVORNO REFINERY HF3 PLANT

The project involved the supply of a Reactor R-1001A for the HF3 Plant at ENI's Livorno Refinery, intended for hydrocarbon treatment. The equipment, weighing 21,000 kg, was manufactured from ASTM A387 Gr.11 steel with A347 cladding. The reactor was designed for a pressure of 110 barg and a temperature of 336 °C. The project included process calculation verification, General Arrangement development, preparation of construction and installation drawings, equipment supply and IIS construction supervision.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231