
Back to projectsModules onshore
CONSTRUCTION OF 11 SKIDS – SILICA GEL SYSTEM – PETROBEL ZOHR FIELD
SIIRTEC
Location
Egitto
Year / Duration
2016 · 2016 / 2018
Project Description
LOOSE PIPING – PETROBEL ZOHR FIELD, EGYPT Prefabrication and testing of: 11 SKIDS and LOOSE PIPING for the SILICA GEL SYSTEM Project TRAIN SKIDs 6-7-8 and LOOSE PIPING
Related
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
View detail