
CONSTRUCTION OF NO. 8 MODULES – DIESEL ISOTHERMIC HYDROTREATER – TARASOVSKOE FIELD
APS
Location
Federazione Russa
Year / Duration
2016 · 2016
No. 8 MODULES FOR DIESEL ISOTHERMIC HYDROTREATER AND LOOSE PIPING • Supply, prefabrication, and assembly of piping; • Supply, prefabrication, and assembly of main and auxiliary steel structures; • Supply, prefabrication, and assembly of auxiliary supports for piping; • Supply, prefabrication, and assembly of shipping supports; • Instrumentation installation; • Module assembly, testing, painting, and preparation for shipment. Skid dimensions are designed for rail transport: length 12 m, width 2.7 m, height 2.6 m.
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
View detail