Location
Congo
Year / Duration
2015 · 2015
ENI M'BOUNDI – ENI M'BOUNDI FIELD (CONGO) SCOPE OF WORK: Supply of 1 Glycol Regeneration Skid with BEU-BET Heat Exchanger ENGINEERING SERVICES PROVIDED: • Process calculation verification • General arrangement • Construction drawings • Installation drawings EQUIPMENT: • Gas Stripping Column – Tag 02-320-1-VE-001 • Internal Diameter: 2,250 mm • Length (TL–TL): 13,000 mm • Internal Packing Material: Mellapack 252Y, AISI 304 material Design temperature: 180 °C | Design pressure: 32 bar(g)
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail