Location
Congo
Year / Duration
2015 · 2015
ENI M'BOUNDI – ENI M'BOUNDI FIELD (CONGO) SCOPE OF WORK: Supply of 1 Glycol Regeneration Skid with BEU-BET Heat Exchanger ENGINEERING SERVICES PROVIDED: • Process calculation verification • General arrangement • Construction drawings • Installation drawings EQUIPMENT: • Gas Stripping Column – Tag 02-320-1-VE-001 • Internal Diameter: 2,250 mm • Length (TL–TL): 13,000 mm • Internal Packing Material: Mellapack 252Y, AISI 304 material Design temperature: 180 °C | Design pressure: 32 bar(g)
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
View detail