Location
Cortemaggiore, Italia
Year / Duration
2014 · 2014 / 2015
SNAM RETE GAS/TECHNIP (CORTEMAGGIORE – IT) SERVICE: Separation unit ENGINEERING SERVICES PROVIDED: Process calculation verification General arrangement Fabrication drawings Installation drawings EQUIPMENT: Supply of 1 High Efficiency Separator, item 300-AVS-101 3,400 mm Length | 1,500 mm Internal Diameter (ID) | 1,640 kg Weight | 60 mm Thickness Process data: Design temperature: 70 °C Design pressure: 90 Barg
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail