Logo
GruppoAntonini
StoryDivisionsCommitmentProjects
StoryDivisionsCommitmentProjects
EPC C.R.U. (UNITÀ DI RECUPERO DEL CONDENSATO) – CAMPO M'BOUNDI
Back to projects
Onshore

EPC C.R.U. (CONDENSATE RECOVERY UNIT) – M'BOUNDI FIELD

ENI Congo

Location

Congo

Year / Duration

2014 · 2014 / 2015

All projects
Project Description

M'Boundi Oil Centre is located in M'Boundi, Republic of Congo. The onshore oil facility has a production capacity of 41,000 BOPD and associated gas production of 3 MMSCMD, which is currently flared. Due to flaring restrictions and the need for gas in power generation, gas treatment facilities must be installed at the M'Boundi Oil Centre. The scope of work covers: • Management • Engineering • Procurement • Transportation • Fabrication • Construction • Installation • Commissioning • Start-up • Performance testing activities related to the Condensate Recovery Unit (CRU) package and associated structures. THE CRU AND ASSOCIATED STRUCTURES CONSIST OF THE FOLLOWING MAIN COMPONENTS: • Condensate Recovery & Stripping Section – Unit 320 • Stripped Gas Compression Section – Unit 360 • Propane Refrigeration & Storage System – Unit 400 • Utilities • Civil & Structural Works • Electrical Works • Instrumentation Works FEED GAS PROPERTIES AT THE CRU INLET ARE AS FOLLOWS: • Design Capacity: 3.2 MMSCMD • Nominal Capacity: 3 MMSCMD • Reduced Capacity: 0.25 MMSCMD Operating Pressure: 57.5 bar(g) | Operating Temperature: 48.85 °C (normal design case) Maximum Operating Temperature: 48.85 °C (reduced case) | Maximum Water Dew Point: -20 °C @ 58 bar(g)

Gallery
Related

Other Related Projects

03
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning

View detail
REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.

View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231