ENI CONGO – ENI M'BOUNDI FIELD (CONGO) SERVICE: EPCI contract for the revamp of the active fire protection system at the M'Boundi facility, Congo ENGINEERING SERVICES PROVIDED: Civil, Mechanical/Piping, Instrumentation Engineering, Procurement, Prefabrication and Onsite Installation, Storage Tank Construction, Painting, Pre-commissioning, and SAT (System Acceptance Test) EQUIPMENT: Service water storage tank, tag 01-520-0-TA-001 Tank data: Wall thickness: 5,660 mm | Internal diameter (ID): 7,400 mm Weight: 12,623 kg | Capacity: 184 m³ Process data: Design temperature: 80°C | Design pressure: 32 bar(g)
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.