Location
Ravenna, Italia
Year / Duration
2013 · 2013
ACOMON – RAVENNA PETROCHEMICAL PLANT (IT) SCOPE OF WORK: Supply of dehydration columns CA1 – CB103 ENGINEERING SERVICES PROVIDED: Process calculation verification General arrangement Fabrication drawings Installation drawings EQUIPMENT: Dehydration column CA1: 1500 mm Internal Diameter (ID) | 19,535 mm Length Dehydration column CB103: 850 mm Internal Diameter (ID) | 1,200 mm Length
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
View detail