Location
Ravenna, Italia
Year / Duration
2013 · 2013
ACOMON – RAVENNA PETROCHEMICAL PLANT (IT) SCOPE OF WORK: Supply of dehydration columns CA1 – CB103 ENGINEERING SERVICES PROVIDED: Process calculation verification General arrangement Fabrication drawings Installation drawings EQUIPMENT: Dehydration column CA1: 1500 mm Internal Diameter (ID) | 19,535 mm Length Dehydration column CB103: 850 mm Internal Diameter (ID) | 1,200 mm Length
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE EIE S.p.A. COASTAL STORAGE DEPOT IN VENICE
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENILIVE BIOREFINERY SITE (GELA)
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail