Location
Fiume Triste, Italia
Year / Duration
2012 · 2012
FIUME TRISTE GAS CENTER – IT SERVICE: Dehydration column revamp ENGINEERING SERVICES OFFERED: Process calculation verification General arrangement Construction drawings Installation drawings EQUIPMENT: Installation works of internal structured packing inside the dehydration columns. Internal structured packing: supplier Koch-Glitsch Column Ø: 3,000 mm | Length: 18,000 mm
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
View detail