Location
Fiume Triste, Italia
Year / Duration
2012 · 2012
FIUME TRISTE GAS CENTER – IT SERVICE: Dehydration column revamp ENGINEERING SERVICES OFFERED: Process calculation verification General arrangement Construction drawings Installation drawings EQUIPMENT: Installation works of internal structured packing inside the dehydration columns. Internal structured packing: supplier Koch-Glitsch Column Ø: 3,000 mm | Length: 18,000 mm
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE EIE S.p.A. COASTAL STORAGE DEPOT IN VENICE
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENILIVE BIOREFINERY SITE (GELA)
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail