SERGNANO GAS CENTER – IT SERVICE: Supply of 4 glycol regeneration units ENGINEERING SERVICES OFFERED: Process Engineering, Structural Engineering, Piping & Mechanical Engineering, Electrical / Instrumentation Engineering Equipment list in the glycol regeneration unit: Glycol Reboiler Glycol Regeneration Column Stripping Column Regenerated Glycol Accumulator Spent/Regenerated Glycol Heat Exchanger Top Condenser Air Cooler for Glycol Spent Glycol Filter Coalescing Filter Regenerated Glycol Filter Glycol Transfer Pumps Glycol Drain Tank PROCESS DATA: Maximum wet glycol treatment capacity: 204 m³/day Unit flexibility: 50–120% of maximum capacity Estimated stripping gas consumption: 80 kg/h Operating conditions of incoming wet glycol: Flow rate: 9,504 kg/h | Temperature: 30°C | Pressure: 7.7 bar a | Water content: 4.14 wt% Operating conditions of outlet glycol: Flow rate: 9,137 kg/h | Temperature: 47°C | Pressure: 3.0 bar a | Water content: 0.3 wt%
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE EIE S.p.A. COASTAL STORAGE DEPOT IN VENICE
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENILIVE BIOREFINERY SITE (GELA)
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning