Logo
GruppoAntonini
StoryDivisionsCommitmentProjects
StoryDivisionsCommitmentProjects
STOGIT SERGNANO – N.4 IMPIANTI DI RIGENERAZIONE GLICOLE
Back to projects
Onshore

STOGIT SERGNANO – N.4 GLYCOL REGENERATION UNITS

STOGIT

Location

Sergnano, Italia

Year / Duration

2012 · 2012

All projects
Project Description

SERGNANO GAS CENTER – IT SERVICE: Supply of 4 glycol regeneration units ENGINEERING SERVICES OFFERED: Process Engineering, Structural Engineering, Piping & Mechanical Engineering, Electrical / Instrumentation Engineering Equipment list in the glycol regeneration unit: Glycol Reboiler Glycol Regeneration Column Stripping Column Regenerated Glycol Accumulator Spent/Regenerated Glycol Heat Exchanger Top Condenser Air Cooler for Glycol Spent Glycol Filter Coalescing Filter Regenerated Glycol Filter Glycol Transfer Pumps Glycol Drain Tank PROCESS DATA: Maximum wet glycol treatment capacity: 204 m³/day Unit flexibility: 50–120% of maximum capacity Estimated stripping gas consumption: 80 kg/h Operating conditions of incoming wet glycol: Flow rate: 9,504 kg/h | Temperature: 30°C | Pressure: 7.7 bar a | Water content: 4.14 wt% Operating conditions of outlet glycol: Flow rate: 9,137 kg/h | Temperature: 47°C | Pressure: 3.0 bar a | Water content: 0.3 wt%

Related

Other Related Projects

03
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning

View detail
REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.

View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231