Location
Gagliano, Italia
Year / Duration
2012 · 2012
GAGLIANO GAS CENTER – IT SERVICE: Gasoline storage tank ENGINEERING SERVICES OFFERED: Process calculation verification General arrangement Construction drawings Installation drawings PROCESS DATA: Internal vapor space design pressure: 0.49 barg External tank design pressure: F.V. External vapor space design pressure: F.V. Operating pressure: atmospheric Design temperature min/max: 5/60 °C Operating temperature: ambient Fluid: gasoline Vapor space fluid: air Specific gravity of gasoline at 15°C: 736 kg/m³ EQUIPMENT: 1 steel storage tank (220-VA-101) Internal diameter of main body: 1,100 mm | Internal diameter of Jacket: 1,200 mm | Length (T.L.1 T.L): 1,850 mm
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
View detail