Location
Tunisia
Year / Duration
2010 · 2010
ENI TUNISIA – GAZ DU SUD PROJECT SERVICE: Supply of glycol regeneration skid ENGINEERING SERVICES OFFERED: Process Engineering Structural Engineering Piping & Mechanical Engineering Electrical / Instrumentation Engineering EQUIPMENT: 00-3101-XX-101 – Gas Dehydration Package 00-3801-XX-101 – TEG Regeneration Unit The first package is designed to remove water vapor from wet gas coming from the refrigeration unit, achieving a dew point of 0°C at 20 barg. Moisture is removed in a high-pressure column (contactor) using a TEG solution introduced at the top of the tower, while gas flows upward through structured packing where water absorption occurs. The dehydrated gas is then sent to the compression unit. After water absorption, the spent glycol is sent to the regeneration unit (00-3801-XX-101), where it is reconcentrated by boiling off water at atmospheric pressure, applying heat and a negligible amount of stripping gas. Process Data: Unit capacity: 2,500,000 Sm³/day | Unit flexibility: 20–100% | Nominal pressure: 30 bars(g) | Design pressure: 40 bars(g) | Nominal temperature: 20 °C | Design temperature: 60 °C
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE EIE S.p.A. COASTAL STORAGE DEPOT IN VENICE
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENILIVE BIOREFINERY SITE (GELA)
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail