C.LE GAS SABBIONCELLO – IT SERVICE: EPC CONTRACT FOR N. 2 GLYCOL REGENERATION SKIDS 200 m³/d ENGINEERING SERVICES OFFERED: Process Engineering Structural Engineering Piping & Mechanical Engineering Electrical / Instrumentation Engineering EQUIPMENT: Process Data: Maximum wet glycol treatment capacity: 200 m³/day. Plant flexibility: 20–110% of maximum capacity. Percentage of water in incoming wet glycol: 9 wt%. Concentration of regenerated glycol: 99.5 wt% using stripping gas. Expected stripping gas consumption: 33 kg/h. Operating conditions of incoming wet glycol: Temperature: 30 °C Pressure: 6 bar a. Below is the list of equipment included in the glycol regeneration unit: Glycol Heater FR-101 Glycol Regeneration Column VE-101 Stripping Column VE-102 Regenerated Glycol Accumulators VB-101 Waste/Regenerated Glycol Heat Exchanger HA-102 Main Condenser HV-101 Air Cooling for Glycol HC-101 Waste Glycol Filter CL-101A/B Coalescing Filter CN-101 Regenerated Glycol Filter CL-102A/B Glycol Transfer Pumps PA-101A/B
Other Related Projects

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)
EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE EIE S.p.A. COASTAL STORAGE DEPOT IN VENICE
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning
View detail
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENILIVE BIOREFINERY SITE (GELA)
EPC contract for engineering, material supply, prefabrication and erection at site, pre-comm & commissioning