Location
Sabbioncello, Italia
Year / Duration
2006 · 2006
C.LE GAS SABBIONCELLO – IT SERVICE: EPC CONTRACT FOR N. 2 GLYCOL REGENERATION SKIDS 200 m³/d ENGINEERING SERVICES OFFERED: Process Engineering Structural Engineering Piping & Mechanical Engineering Electrical / Instrumentation Engineering EQUIPMENT: Process Data: Maximum wet glycol treatment capacity: 200 m³/day. Plant flexibility: 20–110% of maximum capacity. Percentage of water in incoming wet glycol: 9 wt%. Concentration of regenerated glycol: 99.5 wt% using stripping gas. Expected stripping gas consumption: 33 kg/h. Operating conditions of incoming wet glycol: Temperature: 30 °C Pressure: 6 bar a. Below is the list of equipment included in the glycol regeneration unit: Glycol Heater FR-101 Glycol Regeneration Column VE-101 Stripping Column VE-102 Regenerated Glycol Accumulators VB-101 Waste/Regenerated Glycol Heat Exchanger HA-102 Main Condenser HV-101 Air Cooling for Glycol HC-101 Waste Glycol Filter CL-101A/B Coalescing Filter CN-101 Regenerated Glycol Filter CL-102A/B Glycol Transfer Pumps PA-101A/B
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.
View detail