RAVENNA MARE GAS STATION – IT SERVICE: Glycol Regeneration Skid ENGINEERING SERVICES PROVIDED: Process Engineering Structural Engineering Piping and Mechanical Engineering EQUIPMENT: 2 TEG regenerators with a capacity of 200 m³/day each, with each unit divided into 2 skid units marked as: 0380 FZ 101 1st skid – 0380 FZ 102 2nd skid 0380 FZ 201 1st skid – 0380 FZ 202 2nd skid Each regenerator consists of 2 skid units, which house the following equipment and components: 1st SKID 1 Glycol regenerator – 380 FR 101 / 201 1 Regenerated TEG accumulator – 380 VB 101 / 201 1 Exchanger, inside accumulator – 380 HA 102 / 202 1 Regeneration column – 380 VE 101 / 201 1 Stripping column – 380 VE 102 / 202 1 TEG vapor condenser – 380 HV 101 / 201 1 Air combustion fan – 380 KF 101 / 201 2 Transferring pumps TEG + cooling system – 380 PA 101 A/B / 201 A/B 1 Burner – 380 FX 101 / 201 2nd SKID 1 Exhaust TEG / regenerated TEG exchanger – 380 HA 101 A / 201 A 3 Exhaust TEG / regenerated TEG exchangers – 380 HA 101 B/C/D / 201 B/C/D 2 Exhaust TEG filters – 380 CL 101 A/B / 201 A/B 2 Regenerated TEG filters – 380 CL 102 A/B / 202 A/B 1 Exhaust TEG filter – 380 CN 101 / 201
Other Related Projects

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION
Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.
View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE
EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.
View detail
PC CONSTRUCTION OF 1 O.R.F. (ONSHORE RECEIVING FACILITY) – SANCHEZ MAGALLANES
Construction of 1 O.R.F. (Onshore Receiving Facility) in Mexico, Sanchez Magallanes site – Tabasco, for the ENI Mexico AMOCA, MIZTON, and TECOALLI fields.