ENI – CENTRO GAS GAGLIANO
Back to projects
Onshore

ENI – GAGLIANO GAS CENTER

ENI spa

Location

Gagliano, Italia

Year / Duration

2001 · 2001

All projects
Project Description

GAGLIANO GAS CENTER – IT SERVICE: Gas Centre Gagliano – Italy ENGINEERING SERVICES PROVIDED: Process Engineering Structural Engineering Piping and Mechanical Engineering Electrical/Instrumentation Engineering EQUIPMENT: Gas Heater Skid item 320-FA-01 Gas Heater Skid item 320-FA-02 Absorbing column item 320-VE-02-A-1 Absorbing column item 320-VE-02-B-1 Absorbing column item 320-VE-02-C-1 Absorbing column item 320-VE-02-A-2 Absorbing column item 320-VE-02-B-2 Absorbing column item 320-VE-02-C-2 Stabilization column item 320-VE-01-1 Stabilization column item 320-VE-01-2 Inlet separator item 320-VA-01-1 Inlet separator item 320-VA-01-2 Cooled gas separator item 320-VA-02-1 Cooled gas separator item 320-VA-02-2 Gasoline/gas exchanger item 320-HA-01-1 Gasoline/gas exchanger item 320-HA-01-2 Internal re-boiler column 320-VE-01-1 item 320-HA-02-1 Internal re-boiler column 320-VE-01-1 item 320-HA-02-2

Related

Other Related Projects

03
EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EXECUTION OF MAINTENANCE, IMPROVEMENT AND MODIFICATION ACTIVITIES ON ATMOSPHERIC STORAGE TANKS AT THE ENI REWIND SITE (GELA)

EPC contract for engineering, material supply, prefabrication demolition of the old one and new erection at site, pre-comm & commissioning

View detail
REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

REFURBISHMENT ACTIVITIES OF THE M’BOUNDI PIPELINE – BLOCK VALVE STATION

Refurbishment of the m’boundi pipeline at the block valve station (bvs) from 01 to 12 – 24" cote mateve – m’boundi pipeline repurposing. total hours: 46,200h.

View detail
EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC ONSHORE UPGRADE OF LITCHENDJILI – GAS TREATMENT CAPACITY INCREASE

EPC contract for the Initial Phase of the onshore Litchendjili upgrade – increasing the plant’s gas treatment capacity up to 4 MMSCMD.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231