EXTRAORDINARY MAINTENANCE AND OFFSHORE RENEWAL OF THE EXISTING SPM PLATFORM – API IP FALCONARA
API IP Falconara
Location
Ancona, Italia
Year / Duration
2021 · 2021/2022
Supply of materials, prefabrication, restoration of existing structures, and commissioning of the SPM platform. The work included offshore dismantling of topside structures: 1 external ring DN 25, 2 m, 140 tons; 1 support cross with fenders, approx. 20m x 20m, 180 tons, and the subsequent reinstallation of the structures. Supply of a new cabin, dimensions 9.1m x 2.5m x 3.0m h, including: photovoltaic panels and wind generator, diesel generator set, electrical panels, and associated instrumentation. Replacement of the rotating bearing, and full painting of the SPM platform. Onshore renewal activities with replacement of local structures, external fenders, boat mooring, access, fenders, platform cranes, testing, and onshore pre-commissioning. Offshore transportation and installation, commissioning.
Other Related Projects

EXISTING SPM BOA FOR TANKER APPROACH REVAMPING – API IP
Supply and fabrication of 4 foundation piles, control cabin, and structural frames for SPM buoy. Complete activities including installation, piping prefabrication, dismantling and reinstallation, commissioning, and start-up support.
View detail
STRUCTURAL RENOVATION AND UPGRADE OF THE LOADING BASIN – MILITARY ARSENAL
Supply of materials, prefabrication and installation of structures, painting, mechanical inspection, and transport by barge to the final site. Weight of the dry dock basin: 850 tons, structural demolition and replacement: 50 tons.
View detail
EPCI for the FABRICATION and REPLACEMENT of BOA R2
FABRICATION of the rotating bearing system (DN4000mm rotating bearing, piping, equipment, electrical/instrumentation system, painting) including prefabricated E/I cabin (15 tons), PMCC/ICSS/UPS panels, batteries, HVAC system, etc., onshore testing and pre-commissioning, offshore load-out and rigging, maritime transport, offshore lifting, installation, tie-ins, and commissioning up to start-up. The activity included dismantling of the existing rotating bearing and associated structures and piping.
View detail