MANUTENZIONE STRAORDINARIA E RINNOVAMENTO OFFSHORE DELLA PIATTAFORMA SPM ESISTENTE – API IP FALCONARA
Back to projects
Revamping works

EXTRAORDINARY MAINTENANCE AND OFFSHORE RENEWAL OF THE EXISTING SPM PLATFORM – API IP FALCONARA

API IP Falconara

Location

Ancona, Italia

Year / Duration

2021 · 2021/2022

All projects
Project Description

Supply of materials, prefabrication, restoration of existing structures, and commissioning of the SPM platform. The work included offshore dismantling of topside structures: 1 external ring DN 25, 2 m, 140 tons; 1 support cross with fenders, approx. 20m x 20m, 180 tons, and the subsequent reinstallation of the structures. Supply of a new cabin, dimensions 9.1m x 2.5m x 3.0m h, including: photovoltaic panels and wind generator, diesel generator set, electrical panels, and associated instrumentation. Replacement of the rotating bearing, and full painting of the SPM platform. Onshore renewal activities with replacement of local structures, external fenders, boat mooring, access, fenders, platform cranes, testing, and onshore pre-commissioning. Offshore transportation and installation, commissioning.

Gallery
Related

Other Related Projects

03
FANO PLANT REVAMPING ACTIVITIES

FANO PLANT REVAMPING ACTIVITIES

The scope of work consists of the revamping of the Fano station

View detail
EXISTING SPM BOA FOR TANKER APPROACH REVAMPING – API IP

EXISTING SPM BOA FOR TANKER APPROACH REVAMPING – API IP

Supply and fabrication of 4 foundation piles, control cabin, and structural frames for SPM buoy. Complete activities including installation, piping prefabrication, dismantling and reinstallation, commissioning, and start-up support.

View detail
STRUCTURAL RENOVATION AND UPGRADE OF THE LOADING BASIN – MILITARY ARSENAL

STRUCTURAL RENOVATION AND UPGRADE OF THE LOADING BASIN – MILITARY ARSENAL

Supply of materials, prefabrication and installation of structures, painting, mechanical inspection, and transport by barge to the final site. Weight of the dry dock basin: 850 tons, structural demolition and replacement: 50 tons.

View detail
GA

Gruppo Antonini

Forging the Future

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia

Operational Office: Località Pertusola, 19032 Lerici (SP) Italia

P.IVA: IT00364890459

Energy Division

+39 0187 1771331

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

Gruppo Antonini

Engineering & Offshore Projects

info@gruppoantonini.it+39 0187 1771331

Registered Office: P.zza Castello 26 - 20121 Milano (MI) Italia
Operational Office: Località Pertusola, 19032 Lerici (SP) Italia
P.IVA: IT00364890459

Energy Division

info@gruppoantonini.it+39 0187 1771331
Write to us

Antonini Navi

info@antonininavi.com+39 0187 1771331antonininavi.com

Marina

nautica@gruppoantonini.it+39 3372254310187 1771344
Careers

© 2026 Gruppo Antonini S.p.A.

Legal notesCookiePrivacyModello 231