Supply of MATERIALS and FABRICATION of 4 foundation piles, 1 control cabin for operators, and structural support frames, including pile installation on site, prefabrication of piping and structures, dismantling of the existing piping system and new installation, civil reinforcement, tie-ins, pre-commissioning and commissioning, and start-up support for the Client. Offshore transportation and installation, commissioning. Weights: Piles: 50 tons, Cabin and related structures: 20 tons, Piping and supports: 11 tons, Cabin dimensions: 6m x 2.5m x 3m (h).
Other Related Projects

EXTRAORDINARY MAINTENANCE AND OFFSHORE RENEWAL OF THE EXISTING SPM PLATFORM – API IP FALCONARA
Material supply, prefabrication, structural restoration, and commissioning of the offshore SPM platform for API IP Falconara. Dismantling and reinstallation of topside structures, supply of new cabin, replacement of rotating bearing, and full painting.
View detail
STRUCTURAL RENOVATION AND UPGRADE OF THE LOADING BASIN – MILITARY ARSENAL
Supply of materials, prefabrication and installation of structures, painting, mechanical inspection, and transport by barge to the final site. Weight of the dry dock basin: 850 tons, structural demolition and replacement: 50 tons.
View detail
EPCI for the FABRICATION and REPLACEMENT of BOA R2
FABRICATION of the rotating bearing system (DN4000mm rotating bearing, piping, equipment, electrical/instrumentation system, painting) including prefabricated E/I cabin (15 tons), PMCC/ICSS/UPS panels, batteries, HVAC system, etc., onshore testing and pre-commissioning, offshore load-out and rigging, maritime transport, offshore lifting, installation, tie-ins, and commissioning up to start-up. The activity included dismantling of the existing rotating bearing and associated structures and piping.