FANO STATION REVAMPING ACTIVITIES - ENI Ravenna
The scope of work consists of the revamping of the Fano station
Location
FANO
Year / Duration
2026
The scope of work consists of the revamping of the Fano station for the installation of compression units, including the construction and erection of a new steel structure and shelter, the construction and erection of a new pipe rack, the fabrication and installation of six (6) KO Drums, the fabrication and installation of piping systems including manual valves, actuated valves, pressure safety valves (PSVs) and liquid drain systems, the construction and installation of air coolers, powder skid and deluge system skid, the installation of transformers and power factor correction equipment, the installation of new medium-voltage (MV) switchboards, the construction and installation of electrical cable trays, the installation of power and instrumentation cables, and the installation of all associated field instrumentation and control devices. The scope also includes all ancillary and minor works required for the complete integration, testing and commissioning of the new facilities, ensuring a fully operational compression station at the Fano site.
Other Related Projects

EPC WHPA LIVING QUARTER
Project Engineering, Procurement and Construction of the WHPA platform Living Quarters, supply of mechanical components and piping systems, process skids and packages, installation of electrical and instrumentation systems.
View detail
EPCIC COMPRESSION MODULE FOR SABRATHA PTF
Details, construction and installation engineering, material supply, fabrication, transportation of 1 Compression Module, offshore installation and commissioning.
View detail
EPCI N. 2 PRE-DRILLING TEMPLATE & DOCKING PILE
Detailed, construction, and installation engineering, procurement, fabrication, load-out and rigging on cargo barge, transportation to site and installation, drilling support.
View detail