Location
Isola del Giglio, Italia
Year / Duration
2012 · 2012-2013
Fabrication of 12 anchor points and anchor blocks, 12 towers, foundations, and casing piles used for the ship removal operation at Giglio Island. Total weight of fabricated and supplied structures: 850 tonnes.
Other Related Projects

FANO PLANT REVAMPING ACTIVITIES
The scope of work consists of the revamping of the Fano station
View detail
EXTRAORDINARY MAINTENANCE AND OFFSHORE RENEWAL OF THE EXISTING SPM PLATFORM – API IP FALCONARA
Material supply, prefabrication, structural restoration, and commissioning of the offshore SPM platform for API IP Falconara. Dismantling and reinstallation of topside structures, supply of new cabin, replacement of rotating bearing, and full painting.
View detail
EXISTING SPM BOA FOR TANKER APPROACH REVAMPING – API IP
Supply and fabrication of 4 foundation piles, control cabin, and structural frames for SPM buoy. Complete activities including installation, piping prefabrication, dismantling and reinstallation, commissioning, and start-up support.
View detail