Location
Isola del Giglio, Italia
Year / Duration
2012 · 2012-2013
Fabrication of 12 anchor points and anchor blocks, 12 towers, foundations, and casing piles used for the ship removal operation at Giglio Island. Total weight of fabricated and supplied structures: 850 tonnes.
Other Related Projects

EXTRAORDINARY MAINTENANCE AND OFFSHORE RENEWAL OF THE EXISTING SPM PLATFORM – API IP FALCONARA
Material supply, prefabrication, structural restoration, and commissioning of the offshore SPM platform for API IP Falconara. Dismantling and reinstallation of topside structures, supply of new cabin, replacement of rotating bearing, and full painting.
View detail
EXISTING SPM BOA FOR TANKER APPROACH REVAMPING – API IP
Supply and fabrication of 4 foundation piles, control cabin, and structural frames for SPM buoy. Complete activities including installation, piping prefabrication, dismantling and reinstallation, commissioning, and start-up support.
View detail
STRUCTURAL RENOVATION AND UPGRADE OF THE LOADING BASIN – MILITARY ARSENAL
Supply of materials, prefabrication and installation of structures, painting, mechanical inspection, and transport by barge to the final site. Weight of the dry dock basin: 850 tons, structural demolition and replacement: 50 tons.
View detail